首页> 外文会议>Iron and Steel Technology Conference >Upgrade of ArcelorMittal Indiana Harbor #2 Galvanizing Line Making 2CGL Great Again
【24h】

Upgrade of ArcelorMittal Indiana Harbor #2 Galvanizing Line Making 2CGL Great Again

机译:升级ArcelorMittal印第安纳州港口#2镀锌线再次制作2cgl

获取原文

摘要

The #2CGL at the Indiana Harbor was built in 1964 by Youngstown Sheet and Tube. The line is a 72" wide horizontal furnace line capable of running heavy and light gauge products. The line has undergone several upgrades over the years to improve capacity, quality and reliability. These upgrades included: · 1988 - 25% productivity increase which included tower and furnace improvements · 1992 - Shape improvements which included in-line temper mill and tension leveler · 1994-97 - Several electrical upgrades to various parts of the line to improve the reliability. 2CGL is a line with demonstrated capacity of 585,000 tons per year depending on the product mix placed on the line. In the past the line produced a large amount of automotive product as well as non-automotive sheet. The amount of automotive production has decreased over the years as newer galvanizing lines have been commissioned.
机译:印第安纳港的#2CGL是由Youngstown Sheet和Tube建造的1964年。该线是一条72英寸宽水平炉线,能够运行重型和灯具制品。该线多年来经历了几年升级,以提高能力,质量和可靠性。这些升级包括:·1988 - 25%的生产力增加塔和炉子改进·1992年 - 塑造改进,包括在线炼金厂和张力换档机构·1994-97 - 几个电气升级到生产线的各个部分以提高可靠性。2CGL是每年585,000吨的一条线,取决于每年585,000吨的线在置于生产线上的产品混合物。在过去,该线生产了大量的汽车产品以及非汽车纸。多年来汽车生产的数量随着较新的镀锌线被委托。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号