ENVIRONMENTAL DESIGN AND MONITORING OF LARGE SUBMARINE OUTFALLS: AN INTEGRATED APPROACH FOR COASTAL PROTECTION

机译:大潜艇排排的环境设计与监测:沿海保护的综合方法

获取原文

摘要

In order to address the environmental impact produced for decades to the water bodies, the authorities of the major coastal municipalities and counties in North Spain (Gulf of Biskay) initiated, during the 90's, the design and construction of new sanitation systems, according to the legal requirements imposed by the 91/271/EC Directive. Site planning, environmental risk assessment of discharges and objective-oriented monitoring were the three main tasks supporting the decision-making process related to the validation of the new sewerage projects. This process consists of four consecutive stages: 1) Design and selection of alternatives (strategic assessment), 2) Risk evaluation for different scenarios (impact assessment), 3) Verification of adverse effects (objective-oriented monitoring) and 4) Action plan for mitigation of registered impacts (management of pollution events). Regarding impact assessment, mathematical and statistical studies for the selection of appropriate points of discharge of sewage outfalls have been an important time and labor-consuming task for the pre-commissioning stage, taking into account the random nature of the factors that influence the dispersion and reaction of different contaminants in the sea, Thus, depending on the stage of the analysis (planning vs. project design) and, consequently, the precision level needed to infer from the respective results, this procedure might support either the preliminary selection of alternatives (SEA) or the final design of the projected alternative (EIA). On the other hand, monitoring programs were based on modeling predictions and assumptions about likely responses of a great variety of environmental compartments to disturbances, through the implementation of a program of continuous measurements, that support both the definition of the specific objectives to be addressed and the more appropriate technical designs, in order to produce predefined management information useful for decision making.
机译:为了解决几十年生产的环境影响,在水机构上,据90年代,新卫生系统的设计和建设,南西班牙主要沿海地区和县(BiCkay湾)的主要沿海市和县的环境影响。 91/271 / EC指令强加的法律要求。现场规划,出院环境风险评估和客观导向的监测是支持与新污水处理项目验证有关的决策过程的三个主要任务。这个过程由四个连续阶段组成:1)设计和选择替代方案(战略评估),2)不同情景(影响评估)的风险评估,3)核查不利影响(客观导向的监测)和4)行动计划减缓注册影响(污染事件的管理)。关于影响污水排污口的适当排放点的影响评估,数学和统计研究一直是对预测阶段的重要时间和劳动力的任务,考虑到影响分散的因素的随机性和因此,不同污染物在海中的反应,因此,取决于分析的阶段(规划与项目设计),因此,从各个结果中推断所需的精确度,此程序可能支持替代方案的初步选择(海洋)或预计替代品(EIA)的最终设计。另一方面,监测计划通过实施持续测量计划来基于建模预测和关于对扰动的各种环境隔间的可能反应的建模和假设,这支持有关要解决的具体目标的定义更合适的技术设计,以生产用于决策的预定义管理信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号