Piping In Tight Quarters: Special Design Challenges For Waterworks Plant Yard Piping

机译:狭窄宿舍的管道:水厂厂房管道的特殊设计挑战

获取原文
获取外文期刊封面目录资料

摘要

Designing new yard piping at existing waterworks plants can be very challenging, especially at already congested sites. There are always several issues associated with existing piping, including the actual location of all old utility lines, which can be helped by the use of Subsurface Utility Engineering that uses nondestructive geophysical investigation techniques. Connecting to and constructing very near existing lines can also be a challenge. Multiple pipeline crossings can result in several conditions that must be given attention, but a detailed sequence of construction can help minimize disruptions and plant shutdowns. Alignment issues include proper separation between water and wastewater lines, designing for future repairs and expansions, keeping utilities in defined corridors, and minimizing the number of fittings. Piping systems must be designed with the appropriate linings, coatings, pipe materials, pressure classes, beddings, joints, corrosion protection, and testing requirements. Designers must stay abreast of the new materials in the market in order to properly analyze alternate systems. Depth of cover plays a very large part in design, as does seismic considerations, and the need for thrust restraint and flexibility at connections to buildings. A critical step in the design is specifying the proper pressure testing procedures, for which a few alternatives are discussed. Good record drawings are a must, as is a design that is cost-effective, since yard piping is so much more expensive per unit of length than equivalent linear pipelines.
机译:在现有的水上工厂设计新的院子管道可能非常具有挑战性,特别是在已经拥挤的地点。与现有管道有关的几个问题,包括所有旧电效线的实际位置,可以通过使用使用非破坏性地球物理调查技术的地下公用事业工程来帮助。连接和构建非常近的现有线路也可能是一个挑战。多个管道过境点可能导致若干条件必须引起注意,但详细的建筑顺序可以帮助最小化中断和工厂停机。对准问题包括水和废水线之间的适当分离,设计用于未来的维修和扩展,保持限定走廊的公用事业,并最大限度地减少配件数量。管道系统必须设计有适当的衬里,涂层,管材,压力等级,床上床,接头,腐蚀保护和测试要求。设计师必须及时了解市场的新材料,以便适当地分析备用系统。覆盖景深在设计中起到很大的设计,以及地震的考虑,以及在与建筑物的连接中推力限制和灵活性的需要。设计中的关键步骤是指指定适当的压力测试程序,讨论了一些替代方案。良好的记录图是一种必须的设计,这是一种具有成本效益的设计,因为围场管道每单位长度比等效线性管道更昂贵。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号