Installation of combined sewer overflow (CSO) consolidation conduits in difficult waterfront conditions would have been no easy task as originally designed and bid, using cut-and-cover methods, yet an aggressive Value Engineering (VE) proposal was accepted and the installation accomplished using pipe jacking methods. Five-hundred-and-ten (510) feet of conventional pipe jacking was successfully accomplished to install 54-inch and 30-inch consolidation conduits as part of the Narragansett Bay Commission's (NBC) CSO Control Facilities Program. This paper will present site conditions, a comparison of the original cut-and-cover design and the VE pipe jacking proposal, provide construction details and challenges. The conduits were installed in a narrow strip of land between historic waterfront structures and the Providence River with a portion of the alignment beneath high-tension towers and transmission lines. The ground conditions consisted of urban fill, a soft organic silt deposit, and abandoned power tunnels, slips and wharfs. Bid documents directed an open cut with an Owner-designed secant pile wall support of excavation and installation of reinforced concrete pipe (RCP) for the conduits, and the Contractor's proposed VE largely eliminated open cut and included pipe jacking with sheeted pits. The VE proposal was negotiated and the Contractor successfully completed the pipe jacking using an open-face shield, ground improvement using chemical grouting, Permalok steel casing and high density polyethylene (HDPE) pipe. Several large obstructions, including concrete-filled vaults, abandoned tunnels, timber piles, and steel sheet piling were encountered and excavated from within the pipe jacking shield. Challenges and risks associated with open-cut excavation in a difficult waterfront environment were significantly reduced by implementing the pipe jacking VE change, but were not entirely eliminated.
机译:安装组合的下水道溢出(CSO)整合导管在困难的海滨条件下,使用切割和覆盖方法,尚未接受侵略性的价值工程(VE)提案并使用管道升降方法。成功完成了五百和十(510)英尺的常规管道,以安装54英寸和30英寸的合并导管,作为Narragansett Bay委员会(NBC)CSO控制设施计划的一部分。本文将呈现网站条件,比较原始切割设计和VE管道杰出建议,提供施工细节和挑战。导管安装在历史悠久的海滨结构和普罗维登斯河之间的狭窄地带地带,其中一部分在高压塔和传输线下方的一部分对齐。地面条件包括城市填充,软有机淤泥矿床和废弃的电源隧道,滑动和码头。投标文件指导开放式切割,具有钢筋混凝土管道(RCP)的所有者设计的钢管桩墙支撑,以及承包商的拟议普遍消除开放式切割,包括带纸坑的管道。官方提案进行了谈判,承包商使用敞开的屏蔽,使用化学灌浆,永久性钢壳和高密度聚乙烯(HDPE)管道地面改进,完成了管道。遇到和挖掘出几种大型障碍物,包括混凝土拱顶,废弃的隧道,木材桩和钢板打桩。通过实施顶部变化的管道变化,显着降低了与困难的滨水环境中与开放式开挖相关的挑战和风险,但不完全消除。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号