Pipe Jacking in Difficult Urban Waterfront Conditions

机译:在困难的城市海滨条件下顶管

获取原文
获取原文并翻译 | 示例

摘要

Installation of combined sewer overflow (CSO) consolidation conduits in difficultrnwaterfront conditions would have been no easy task as originally designed and bid,rnusing cut-and-cover methods, yet an aggressive Value Engineering (VE) proposalrnwas accepted and the installation accomplished using pipe jacking methods. Fivehundred-rnand-ten (510) feet of conventional pipe jacking was successfullyrnaccomplished to install 54-inch and 30-inch consolidation conduits as part of thernNarragansett Bay Commission's (NBC) CSO Control Facilities Program.rnThis paper will present site conditions, a comparison of the original cut-and-coverrndesign and the VE pipe jacking proposal, provide construction details and challenges.rnThe conduits were installed in a narrow strip of land between historic waterfrontrnstructures and the Providence River with a portion of the alignment beneath hightensionrntowers and transmission lines. The ground conditions consisted of urban fill,rna soft organic silt deposit, and abandoned power tunnels, slips and wharfs. Bidrndocuments directed an open cut with an Owner-designed secant pile wall support ofrnexcavation and installation of reinforced concrete pipe (RCP) for the conduits, andrnthe Contractor's proposed VE largely eliminated open cut and included pipe jackingrnwith sheeted pits. The VE proposal was negotiated and the Contractor successfullyrncompleted the pipe jacking using an open-face shield, ground improvement usingrnchemical grouting, Permalok steel casing and high density polyethylene (HDPE) pipe.rnSeveral large obstructions, including concrete-filled vaults, abandoned tunnels, timberrnpiles, and steel sheet piling were encountered and excavated from within the pipernjacking shield. Challenges and risks associated with open-cut excavation in arndifficult waterfront environment were significantly reduced by implementing the pipernjacking VE change, but were not entirely eliminated.
机译:在最初的设计和招标中,采用切入即盖的方法,在困难的海滨条件下安装组合式下水道溢流(CSO)固结管道将不是一件容易的事,但是积极的价值工程(VE)提议被接受并且使用顶管完成安装方法。作为纳拉甘塞特湾委员会(NBC)CSO控制设施计划的一部分,已成功完成了五百一十(510)英尺的常规顶管工程,以安装54英寸和30英寸的固结导管。最初的挖土设计和VE管道顶进方案提供了施工细节和挑战。管道安装在历史悠久的滨水结构和普罗维登斯河之间的狭窄土地上,高压管道和输电线路下方的部分走线。地面条件包括城市填土,天然有机硅淤泥,废弃的电力隧道,滑坡和码头。 Bidrndocuments使用所有者设计的割线桩墙支护进行开挖,该开挖的开挖墙支持开挖并安装导管的钢筋混凝土管(RCP),承包商建议的VE在很大程度上消除了开挖,并包括了顶起带有薄板坑的管道。 VE提案已通过谈判,承包商成功地使用敞开式盾构完成了顶管,化学灌浆,Permalok钢套管和高密度聚乙烯(HDPE)管道进行了地面改良。 ,遇到了钢板桩,并从顶管护盾内挖掘。通过实施the管VE变更,大大减少了在困难的海滨环境中与露天开采相关的挑战和风险,但并未完全消除。

著录项

  • 来源
  • 会议地点 Boston MA(US);Boston MA(US)
  • 作者单位

    Jacobs Associates, 67 South Bedford Street, Suite 400W, Burlington, MArn01803, PH (781) 229-5820, email: castro@jacobssf.com;

    Haley Aldrich, Inc. 465 Medford, Street Suite 2200, Boston, MArn02129-1400, PH (617) 886-7349, email: tmuindi@haleyaldrich.com;

    Louis Berger Group, 295 Promenade Street, Providence,rnRI 02908, PH (401) 521-5980, email: ghughes@louisberger.com;

    Narragansett Bay Commission, 1 Service Road,rnProvidence, RI 02905, PH (401) 461-8848, email: palbert@narrabay.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道输送;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号