首页> 外文会议>Society of Petroleum Engineers International Thermal Operations and Heavy Oil Symposium >Top-Injection and Bottom-Production(Tinbop)Cyclic Steam-Injection Method Enhances Oil Recovery
【24h】

Top-Injection and Bottom-Production(Tinbop)Cyclic Steam-Injection Method Enhances Oil Recovery

机译:顶部注射和底部制作(TINBOP)循环蒸汽喷射方法增强了采油

获取原文

摘要

We have developed a novel method to enhance oil production during cyclic steam injection.In the Top-Injection and Bottom-Production(TINBOP)method,the well contains two strings separated by two packers(a dual and a single packer): the short string(SS)is completed in the top quarter of the reservoir,while the long string(LS)is completed in the bottom quarter of the reservoir.The method requires an initial warm-up stage where steam is injected into both strings for 21 days;then the LS is opened to production while the SS continues to inject steam for 14 days.After the initial warm-up,the following schedule is repeated:the LS closed and steam is injected in the SS for 21 days;then steam injection is stopped and the LS is opened to production for 180 days. There is no soak period.
机译:我们开发了一种新的方法来加强循环蒸汽注入过程中的油生产。顶部注入和底部制作(TINBOP)方法,井包含两个封装器(双封装器)分隔的两个字符串:短串(SS)在储存器的顶部完成,而长弦(LS)在储存器的下四分之一完成。该方法需要初始预热阶段,其中蒸汽注入两个弦中21天;然后将LS打开到生产,同时SS继续注入蒸汽14天。初始预热后,重复以下时间表:将闭合和蒸汽注入SS 21天;然后停止蒸汽喷射而LS开放到生产180天。没有浸泡的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号