ACCIDENT ANALYSIS OF A SHAFT AND REINFORCEMENT

机译:轴和加固事故分析

获取原文

摘要

As the arrival shaft of the gas pipe which crossing the Yangtze River,before sinking the predetermined place, the deformation of the cutting edge is so distinct that the cracks on the concrete wall widely distributed. The further examination shows the tension cracks or fissure in the concrete was recorded 140 mm to 230 mm from concrete surface, and the maximum relative deformation cpme up to 130 mm. In extraordinary emergencies, the additional steel beams were inserted to stop further movement and distortion. After the close analyses the internal force and situation, a series of reinforcement measures were carry out successfully, which prevent more casualty happening.
机译:作为越过长江的燃气管的到达轴,在沉入预定的地方之前,切削刃的变形如此不同,在混凝土墙上的裂缝广泛分布。进一步的检查显示混凝土中的张力裂缝或裂缝从混凝土表面记录140毫米至230毫米,最大相对变形CPME高达130毫米。在非凡的紧急情况下,插入额外的钢梁以停止进一步的运动和变形。密切分析内部力量和情况后,一系列加固措施成功地进行,防止发生更加伤亡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号