首页> 外文会议>Society of Petroleum Engineers Annual Technical Conference and Exhibition >First Successful Rigless Conversion of Subsurface Safety Valves from Tubing Retrievable to Wireline Retrievable in the Middle East
【24h】

First Successful Rigless Conversion of Subsurface Safety Valves from Tubing Retrievable to Wireline Retrievable in the Middle East

机译:首先成功的防盗阀从管道可检索到中东地区可检索的电线

获取原文

摘要

In the oil and gas industry, safety systems are put in place to prevent the release of hydrocarbons and protect assets against any undesirable events. This can be accomplished by installing protective measures that monitor the process components, and can also control the process in case of undesirable events. The Surface Controlled Subsurface Safety Valve (SCSSSV) is one major component, which is mainly installed in wells that are located offshore or close to populations and environmentally sensitive areas. These SCSSSV can be categorized into two types depending on the deployment/retrieval methodology. The first type is referred to as the Wire Line Retrievable Subsurface Safety Valve (WLRSSSV), which is installed and retrieved by rigless well intervention and installed inside the production tubing. The other type is the Tubing Retrievable Subsurface Safety Valve (TRSSSV) and these valves are part of the tubing completion. Due to its numerous advantages, like full bore access, and not to retrieve the valve before any intervention, TRSSSV are gaining more popularity. Saudi Aramco uses these types of valves and most of the new completions are designed with TRSSSV. Unfortunately, as these types of valves are part of the completion, any failure to close these valves results in a disturbance in the safety system of the well, which will lead to performing an expensive workover, which is not only costly but the process means killing the well, and therefore inducing damage to the reservoir. This paper presents in detail the procedure applied to these inoperable TRSSSVs to regain the safety of the wells and put them back on production without the need to de-complete the well. The direct business impacts are restoring the well safety system, wells' productivity in addition to cost avoidance of (onshore and offshore) workover operation to replace the malfunctioning TRSSSVs. The paper will also cover common mitigation measures to mitigate TRSSSV failure and avoid their conversion.
机译:在石油和天然气行业,安全系统落实到位,以防止碳氢化合物和保护资产免受任何不良事件的释放。这可以通过安装监视过程组件的保护措施来实现,并且还可以控制不希望的事件的情况下的处理。控制井下安全阀(SCSSSV)表面是一个主要组成部分,这主要是安装在离岸或接近位于人口和环境敏感地区的水井。这些SCSSSV可分为依赖于部署/回收的方法两种。第一种类型被称为有线线路可取地下安全阀(WLRSSSV),其被安装并通过rigless修井检索并安装在生产管道的内部。另一种类型是油管回收地下安全阀(TRSSSV)和这些阀是油管完井的一部分。由于其众多的优点,像全通径访问,而不是任何干预前检索阀,TRSSSV正在赢得更多的人气。沙特阿美公司使用这些类型的阀门和大部分新落成的设计与TRSSSV。不幸的是,这些类型的阀门完成的一部分,任何失败的良好的安全系统关闭这些阀门导致的干扰,这将导致执行昂贵的修井,这不仅耗资巨大,而且过程意味着杀死井,因此诱导对储层伤害。详细本文介绍了程序适用于不能手术的这些TRSSSVs重拾井的安全性,并把它们恢复生产,而不需要去完成的很好。直接业务影响正在恢复的很好的安全系统,水井除了生产力成本规避(陆上和海上)修井作业,以更换故障TRSSSVs。该文件也将涵盖常见的缓解措施,以减轻TRSSSV故障,避免了转换。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号