首页> 外文会议>Society of Petroleum Engineers Annual Technical Conference and Exhibition >Barite Sag Occurrence and Resolution during Angolan Completion Operations
【24h】

Barite Sag Occurrence and Resolution during Angolan Completion Operations

机译:Angolan完成操作期间的重点凹陷发生和分辨率

获取原文

摘要

Barite sag or solids sag is a phenomenon where by a fluid sheared at low flowrate does not have the viscous properties necessary to keep the solids within it in suspension. The solids can subsequently fall out of suspension, which can lead to an undesireable build-up of solids in the wellbore or density contrasts within the fluid. During drilling activities solids sag can be avoided by increasing flow rates, rotating the drill pipe, and viscosifying the drilling mud. However, during completions operations, none of these mitigating practices may be possible due to limitations of the setting tools or installed equipment deployed into the well. For open hole completions where sand screens are deployed in highly conditioned muds, solids sag has the potential to be a serious issue, and needs to be avoided. Since 2009, there have been at least four incidents of solids sag occurring during completions operations in the Greater Plutonio development in deepwater Angola, at relatively low fluid densities. Each event manifested itself in a different way, and caused different problems during and after installation of the completion equipment. This paper presents case studies of the solids sag events that occurred during completions operations, and how they either affected installation operations or well productivity. It then describes the work done to eliminate the solids sag, including fluids testing performed to identify it, changes to operational practices, short term modifications to mud rheology, and long term mud solutions.
机译:重晶石凹凸或固体凹陷是通过在低流量下剪切的流体的现象,其不具有使固体在悬浮液中所需的粘性性能。随后可以脱离悬浮液,这可能导致井筒或密度较小的固体的不期望的积聚。在钻井期间,通过增加流速,旋转钻杆,粘合钻井泥浆,可以避免在钻孔活动中。然而,在完成操作期间,由于设置到井中的设置工具或已安装设备的限制,这些缓解实践中没有任何可能。对于在高度条件泥浆中部署沙屏的开放孔完井,固体下垂有可能是一个严重的问题,需要避免。自2009年以来,在深水安哥拉更大的冥王星开发中,在较低的流体密度下,至少有四种发生的固体凹陷发生在较大的钚开发中。每个事件都以不同的方式表现出来,在安装完成设备期间和之后导致了不同的问题。本文介绍了完成操作期间发生的固体SAG事件的案例研究,以及它们如何影响安装操作或生产力。它然后描述了消除固体下垂的工作,包括进行的流体测试以确定它,改变操作实践,对泥流流变的短期修改以及长期泥浆解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号