首页> 外文会议>Society of Petroleum Engineers Annual Technical Conference and Exhibition >The Cottonwood Field Case History: The Pig/Paraffin Obstruction of a Long Subsea, Deepwater Tie-back and Its Successful Remediation
【24h】

The Cottonwood Field Case History: The Pig/Paraffin Obstruction of a Long Subsea, Deepwater Tie-back and Its Successful Remediation

机译:Cottonwood现场案例历史:猪/石蜡阻塞长期海底,深水缠结及其成功修复

获取原文
获取外文期刊封面目录资料

摘要

Cottonwood is the first field development in deepwater Gulf of Mexico operated by Petrobras. It consists of three subsea wells in water depths of 670m (2,200 ft). Two wells presently produce gas-condensate, with high wax deposition potential. The wells are connected to a fixed platform in East Cameron 373 Block, 27.2 km (17 miles) away, through a piggable loop with flowlines of 15.2 cm (6”) nominal and 12.2 cm (4.8”) ID. During a pigging procedure in December 2007, a rigid, 12.9 cm (5.1”) elastomer pig got trapped halfway in the East segment of the loop, after traveling through the West segment. In front of the pig a slug of paraffin was formed and impeded its passage. During two years the production continued through the still open West segment of the production flowline. A wax mitigation plan was implemented, consisting of continuous paraffin dispersant injection. Meanwhile, low-cost, advanced technology-based methods to remove the obstruction were pursued, as an alternative to the high-cost whole or partial East flowline substitution. The procedures attempted were, first, the controlled pressurization of the flowline, second, the application of associated vibration and pressurization. These methods, along with paraffin solvent soaking procedures, helped to release the pig in February 2010, making both segments available for production. However, a layer of wax was formed inside the flowline loop and pig fragments might still be present in the East segment. A cleaning operation was performed to further clean both flowline segments. The operation consisted of injecting sea water mixed with a dispersant, an approach, to our best knowledge, not attempted before in such a long subsea tie-back. The formulations used were thoroughly laboratory tested. The operation demanded noticeable logistics planning and execution, due to the flowline volume (4000 bbl) and the number of volumes circulated (circa of 10). The operation was a success, thereby allowing the restoration of production with full flowline diameter availability and the resumption of routine pigging of the loop.
机译:Cottonwood是墨西哥深水海湾的第一个现场开发,由Petrobras运营。它由370米(2,200英尺)的水深三个海底井组成。两台孔目前生产气凝块,具有高蜡沉积电位。该井连接到东卡梅隆373块的固定平台,距离27.2公里(17英里),通过带有15.2厘米(6英寸)的流动线和12.2cm(4.8“)ID的流动环。在2007年12月的刚性,12.9厘米(5.1英寸)弹性体猪中的刚性,12.9厘米(5.1英寸)在循环的东部陷阱中被困在循环中。在猪前面,形成并阻抗其通过。两年后,生产仍然通过仍然开放的生产流程线。实施蜡缓解计划,由连续石蜡分散剂注射组成。同时,追求低成本,先进的基于技术的方法,以追踪障碍物,是高成本的整体或部分东流线替代的替代品。尝试的程序是,首先,流动线的受控加压,第二,应用相关振动和加压的应用。这些方法以及石蜡溶剂浸泡程序有助于在2010年2月释放猪,使得这两个部分可用于生产。然而,在流线环内形成一层蜡,并且猪碎片可能仍然存在于东部段中。进行清洁操作以进一步清洁流动线段。该操作包括注入与分散剂的海水,一种方法,以我们的最佳知识为止,在这种长海底之前没有尝试过。使用的配方彻​​底测试了实验室。由于流动线卷(4000 BBL)和流通的数量(大约10个),该操作需要明显的物流规划和执行。该操作是成功的,从而允许通过完全流动线直径可用性和恢复环路的恢复恢复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号