An Application of an External Casing Perforating Completion Process in the Wilshire Devonian Field of West Texas - A Case History

机译:外壳穿孔完成过程在西德克萨斯州Wilshire Devonian领域的应用 - 以案例历史

获取原文

摘要

A new External Casing Perforating Technique (EXCP) has been utilized in the Wilshire Devonian Field in West Texas. By applying the new technology, we have been able to improve well performance, worker’s safety, environmental quality and the time from rig release to first sales while holding costs within expectations. The technique was applied on all completions for the Wilshire development program in 2003. On conventional Wilshire completions, 850’ of gross pay was fracture stimulated with 2 to 3 large treatments, at high rates and pressures. The conventional technique consists of perforating on wire line, isolating each zone with bridge plugs, and selectively stimulating each zone. A conventional completion takes 3 to 4 days, with multiple trips to the location, multiple sequences of rigging up and down of service company equipment and flowing back each zone. Numerous people are required on location for the entire process. With the EXCP system, perforating guns with isolation flappers and a hydraulic control line are attached to the outside of the casing, placed on depth and cemented in place. By applying pressure on the hydraulic control line at the surface, the guns are individually fired and the zones isolated with the flapper valves in one step. This system has allowed for more effective stimulations of up to seven individual zones within 14 hours, with immediate flow-back capability. Eliminating post-rig completion work has mostly offset the incremental EXCP cost increase. Production rates are improved while additional value is added due to a safer operation and a reduced impact on the environment.
机译:新的外壳穿孔技术(EXCP)已经在西德克萨斯州Wilshire Devonian领域使用。通过应用新技术,我们已经能够提高良好的性能,工人的安全,环境质量以及钻机发布的时间,同时在期望期内持续成本。该技术是在2003年威尔希尔开发计划的所有完成。关于常规的威尔希尔完井,总工资的850'骨折伴有2至3种大治疗,高速率和压力。传统技术包括在线线上穿孔,与桥塞隔离每个区域,并选择性地刺激每个区域。常规完成需要3至4天,多次浏览该位置,多个索引服务公司设备上下索引并流回每个区域。在整个过程的位置需要众多人。利用EXCP系统,具有隔离式熔接器的穿孔枪和液压控制线附接到壳体的外部,放置在深度并粘合到位。通过在表面上的液压控制线上施加压力,枪支被单独烧制,并且在一步中单独触发和与挡板隔离的区域。该系统在14小时内允许在14小时内更有效地刺激多达七个单个区域,并立即进行返回能力。消除钻机后的完成工作大多抵消了增量的Excp成本增加。生产率得到改善,而由于更安全的操作和对环境的影响降低,增加了额外的值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号