首页> 外文会议>SPE annual technical conference and exhibition >An Application of an External Casing Perforating Completion Process in the Wilshire Devonian Field of West Texas - A Case History
【24h】

An Application of an External Casing Perforating Completion Process in the Wilshire Devonian Field of West Texas - A Case History

机译:外部套管射孔完井工艺在西德克萨斯州威尔希尔泥盆纪油田中的应用-案例历史

获取原文

摘要

A new External Casing Perforating Technique (EXCP) has been utilized in the Wilshire Devonian Field in West Texas. By applying the new technology, we have been able to improve well performance, worker’s safety, environmental quality and the time from rig release to first sales while holding costs within expectations. The technique was applied on all completions for the Wilshire development program in 2003. On conventional Wilshire completions, 850’ of gross pay was fracture stimulated with 2 to 3 large treatments, at high rates and pressures. The conventional technique consists of perforating on wire line, isolating each zone with bridge plugs, and selectively stimulating each zone. A conventional completion takes 3 to 4 days, with multiple trips to the location, multiple sequences of rigging up and down of service company equipment and flowing back each zone. Numerous people are required on location for the entire process. With the EXCP system, perforating guns with isolation flappers and a hydraulic control line are attached to the outside of the casing, placed on depth and cemented in place. By applying pressure on the hydraulic control line at the surface, the guns are individually fired and the zones isolated with the flapper valves in one step. This system has allowed for more effective stimulations of up to seven individual zones within 14 hours, with immediate flow-back capability. Eliminating post-rig completion work has mostly offset the incremental EXCP cost increase. Production rates are improved while additional value is added due to a safer operation and a reduced impact on the environment.
机译:西德克萨斯州的威尔希尔泥盆纪油田采用了一种新的外部套管射孔技术(EXCP)。通过应用新技术,我们能够改善油井性能,工人的安全性,环境质量以及从钻机发布到首次销售的时间,同时将成本控制在预期范围内。该技术在2003年的Wilshire开发计划的所有完工中均得到了应用。 在常规的威尔希尔完井作业中,在高压力和高压力下,使用2到3种大型处理方法可以刺激850’的总工资断裂。常规技术包括在电线上打孔,用电桥塞隔离每个区域,以及选择性地刺激每个区域。常规完工需要3到4天,需要多次前往该地点,需要多次安装和拆卸服务公司的设备,然后流回每个区域。整个过程需要大量人员在现场。 借助EXCP系统,带有隔离挡板的射孔枪和液压控制管线连接到套管的外部,并置于一定深度并固定在适当的位置。通过在地面上的液压控制管路上施加压力,可以独立发射喷枪,并用挡板阀将区域隔离开来。该系统允许在14小时内对多达七个独立区域进行更有效的刺激,并具有即时回流功能。取消钻机后的完工工作大部分可以抵消EXCP成本的增加。由于更安全的操作和对环境的影响减少,生产率得以提高,同时增加了附加值。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号