首页> 外文会议>Enhancing the Value of Data Programs >Montana Department of Transportation
【24h】

Montana Department of Transportation

机译:蒙大拿州交通部

获取原文
获取外文期刊封面目录资料

摘要

Bill Cloud presented a summary of Montana Department of Transportation (DOT) data management issues and activities, responding as follows to the eight questions. What is the biggest data issue you will be facing in the next 18 months? The biggest data issue facing the Montana DOT depends on which individual or group of individuals may be asked the question. Coordination among these entities has become a major focus. Some of the more critical issues are 1. Increased data needs: 1.1 New data items, 1.2 More specificity in existing data items because of improved modeling and analysis tools, and 1.3 More efficient access (user friendly automation). 2. Increasing staff levels: 2.1 Field data collection, 2.2 Data processing and analysis, and 2.3 Programming. 3. Meeting the performance programming process data needs. 4. Meeting the GASB 34 requirements. 5. Integration of the project and financial management systems. Every program area's data needs and concerns are equally important, and it would be difficult, if not impossible, to identify a single most important issue. However, the common link between data in almost all program areas is systems integration. In order to become more efficient in the use and exchange of data between Montana DOT's management systems and other programs, the department began the process several years ago to develop an Oracle-based Transportation Information System (TIS). Since that time, virtually all applications have been rewritten in Oracle. An integrated information architecture, the TIS, has been built, and work continues to fully integrate all the major information systems (bridge, pavement, safety, congestion, performance programming, project scheduling, financial, and others).
机译:比尔云提出了蒙大拿州交通部(DOT)数据管理问题和活动的摘要,尽可能响应八个问题。您将在未来18个月内面临的最大数据问题是什么?面临蒙大拿圆点的最大数据问题取决于可能会询问哪个个人或一群人。这些实体之间的协调已成为一个重大焦点。一些更关键的问题是1.增加数据需求:1.1新数据项,1.2由于改进的建模和分析工具,1.3更有效的访问(用户友好自动化),现有数据项中的更具特异性。 2.员工级别增加:2.1现场数据收集,2.2数据处理和分析,2.3编程。 3.符合绩效编程过程数据需求。 4.满足GASB 34要求。 5.项目和财务管理系统的整合。每个节目区域的数据需求和担忧同样重要,如果不是不可能的话,难以识别一个最重要的问题。但是,几乎所有程序区域的数据之间的常见链接是系统集成。为了在Montana Dot的管理系统和其他计划之间使用和交换数据的使用和交换,部门几年前开始了该过程,以开发基于Oracle的运输信息系统(TIS)。从那时起,几乎所有应用程序都在Oracle中重写。已经建立了一体的信息架构,TIS,并工作继续完全集成所有主要信息系统(桥接,路面,安全,拥塞,性能编程,项目调度,财务等)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号