In the context of a contract in collaboration with Alcatel Space, PyroAlliance has been charged to study an inflation module of a SAR antenna permitting its setting under pressure during 10h. This project deals with the feasibility of a subsystem composed of: Hybrid gas generation technology; Driving by an oxidiser flow regulation system; A module appropriate to the redundant free air is implemented notably to ensure the draining at the end of working. Besides in order to answer the performances and environments formulated by Alcatel, a cooling module is designed to minimize the gas temperature.
展开▼