首页> 外文会议>IEEE/PES Transmission and Distribution Conference Exhibition: Asia and Pacific >Use of Special Protection Systems to Meet the Reliability Criteria During the Double Generators or Double Circuits Outage in the WECC Major Southwest Network Hub
【24h】

Use of Special Protection Systems to Meet the Reliability Criteria During the Double Generators or Double Circuits Outage in the WECC Major Southwest Network Hub

机译:使用特殊保护系统在WECC主要西南网络枢纽中的双发电机或双电路中断期间满足可靠性标准

获取原文

摘要

This paper presents the technical analysis of utilizing the Special Protection Systems (SPS) such as (1): a direct load tripping scheme (DLT) during the two major generating units outage to mitigate the post-transient voltage instability problem and (2): a direct generator tripping scheme (DGT) in the event of double circuits outage to maintain transient stability performance to meet the reliability criteria. Implementation of these SPS can minimize the adverse impact and prevent from further system wide spread cascading outages on the existing system and therefore will maximize system power transfer capability. This paper discuss the planning studies and the associated technical advantages that can be achieved by utilizing these two types of special protection systems in the WECC major southwest network hub.
机译:本文介绍了利用特殊保护系统(SPS)(如(1):直接负载跳闸方案(DLT)的技术分析,在两个主要的生成单位中断,以减轻瞬态电压不稳定问题和(2):一种直接发电机跳闸方案(DGT)如果双电路停电,以保持瞬态稳定性性能以满足可靠性标准。这些SPS的实施可以最大限度地减少对现有系统上进一步的系统广泛差异的级联的影响,因此将最大限度地提高系统功率传输能力。本文讨论了通过利用WECC主要西南网络集线器中的这两种特殊保护系统来实现的规划研究和相关的技术优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号