Platong Gas II Project –World Class Project Execution Through Processes and People

机译:Platong天然气II项目-World类项目通过流程和人员执行

获取原文

摘要

In October 2011, Chevron Thailand Exploration and Production Limited (CTEP) reached an important milestone with the commissioning and start up the Platong Gas II Central Process Platform (CPP). The CPP is able to deliver up to 420 MMSCFD of natural gas and 22,000 BPD of condensate with full water injection facilities. This represents a 20% increase in total gas production from CTEP operated assets, as well as a 10 % increase in the overall gas production for the Kingdom of Thailand. Importantly, this was achieved without compromising large base business operations which deliver up to 1600 MMSCFD of natural gas to Thailand. The $3.1 billion project was successfully delivered by the project team after overcoming many challenges which could have adversely impacted both cost and schedule. Significant challenges included: the hi-jacking of structural steel, high casing wear in wells during drilling and development, and a pipeline integrity event. In the face of these challenges, the project went from Final Investment Decision (FID) in March 2008 to full production in October 2011 with “best in class” on safety, project execution and reserve discovery performance. With the largest float over topside ever installed by Chevron (19,200 tons) and the initial 4 remote production platforms with 92 drilled wells, the project team achieved a flawless, world class start up to full production within two weeks. Each of the challenges faced by this project was overcome by delivering high performance through people and processes aligned with the Chevron Way. The execution plan focused on putting the right mix of experienced people together so subject matter experts (both internal and external) from engineering and base business operations could effectively combine and successfully deliver the project. The value placed around collaboration with the asset team and offshore operations team ensured a seamless transition to operations. Standard processes employed included the disciplined application of reservoir management best practices, leading drilling technology, well head platforms and pipelines fabrication and installation, and Chevron’s MCP project management tool kit. Together, people and processes led to a safe and world class project and positioned Platong Gas II as a model of Chevron Project execution via an integrated multifunctional team.
机译:2011年10月,雪佛龙勘探和生产有限公司(CTEP)达到了一个重要的里程碑,并启动了Platong天然气II中央流程平台(CPP)。 CPP能够提供高达420 MMSCFD的天然气和22,000bpd的冷凝水,具有全水注入设施。这代表了CTEP经营资产的总天然气生产总量增加了20%,以及泰国王国的整体天然气产量增加10%。重要的是,这是在不影响大型基础业务运营的情况下实现的,这为泰国提供了高达1600 mmscff的天然气。项目团队克服了31亿美元的项目,克服了许多可能对成本和日程安排产生不利影响的许多挑战。有重大挑战包括:在钻井和开发期间,井的结构钢,高套管磨损,以及管道完整性事件。面对这些挑战,该项目于2008年3月的最终投资决定(FID)于2011年10月全面生产,以“安全,项目执行和预留发现表现”最佳阶级“。最大的浮动浮动浮游车通过雪佛龙(19,200吨)和初始4次遥控生产平台安装了92钻井,项目团队实现了无瑕的世界级,在两周内启动全面生产。通过通过人和雪佛龙方式对齐的人和进程提供高性能,克服了这个项目所面临的每一个挑战。执行计划的重点是将经验丰富的人员合并在一起,因此来自工程和基础业务运营的主题专家(内部和外部)可以有效地结合并成功提供项目。与资产团队和海上业务团队合作的价值确保了对运营的无缝过渡。雇用的标准流程包括储层管理最佳实践,领先的钻井技术,领先平台和管道制造和安装,以及雪佛龙的MCP项目管理工具套件。在一起,人员和过程导致了安全和世界级项目,并定位了Platong天然气II作为通过集成的多功能团队执行的雪佛龙项目执行的模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号