Advancement in Drilling Increases Penetration Rates in Deep, Hard and Abrasive East Texas Formation

机译:钻井的进步提高了深度,艰难和磨料的东部德克萨斯州的渗透率

获取原文

摘要

This paper details the modifications performed and knowledge gained in 2007 and 2008 while drilling four underbalanced ( UB) vertical gas wells in the Travis Peak formation of the western east Texas deep Bossier play in the Amoroso field, using jointed pipe. In spite of continuous improvements in drilling bit performance and better drilling practices, operators still face the "80-20 rule." Extremely hard and abrasive intervals represent about 20% of the total footage drilled, and they take about 80% of the time to drill out. Performance UB drilling (UBD) technology was used to increase the rate of penetration (ROP) through the formation at depths of 9,800 ft (2,987 m) and greater. The surface and the intermediate casing intervals were drilled conventionally. The next section (8 1/2-in. hole size, using hammer and tricone bits) was drilled using UBD techniques that used straight air or membrane nitrogen (N_2). The injection rates for compressed air or membrane-generated N_2 ranged from 2,800 to 3,400 scfm, and the liquid rates during mist-foam drilling were 14 to 16 gpm (53 to 61 lpm). The section in the first well was drilled with three hammer bits and one tricone bit with an average ROP (including connection times) of 42 fph (13 m/h). Instantaneous ROP in the range of 350 fph (107 m/h) was observed with the hammer bits. A total of 2,378 ft (725 m) in 55.5 hr was drilled UB. During the entire UB phase, penetration rates were significantly greater than the offset records. The operator carried forward the lessons learned from the first well into the second well. A total of 2,750 ft (838 m) in 58.75 hr (using three hammer bits and one tricone bit) was achieved. Based on the second well's success, planning was initiated for the third well with additional improvements in bit design proposed. Enhanced hammer bit design, however, did not yield promising results; the decision was made to drill the remaining section with tricone bits. A total of 3,010 ft (917 m) in 61.7 hr was drilled UB using four hammer bits and three tricone bits. The fourth well was drilled using only tricone bits under UB conditions to compare the ROP between hammer bits and tricone bits. A total of 2,985 ft (910 m) in 76.9 hr was drilled UB using five tricone bits. Improved ROP and overall cost savings were the primary objectives for the client and were achieved. For the rig crew, drilling with compressed air or N_2 was a new experience. Rig training was conducted before the drilling phase by the service company personnel
机译:本文详细介绍了2007年和2008年的修改和知识,同时钻取了四个底层底层(UB)垂直气井,在西部德克萨斯州西部德克萨斯州深博赛尔在Amoroso田间在Amoroso田地中播放,使用了连接管道。尽管钻孔比特性能和更好的钻井实践不断改进,但运营商仍然面临“80-20规则”。极其艰难和磨蚀的间隔代表钻取总筛分的20%,并且他们约有80%的时间来钻出。性能UB钻井(UBD)技术用于通过在9,800英尺(2,987米)和更大的深度中形成渗透率(ROP)。常规钻出表面和中间壳体间隔。使用使用直空气或膜氮(N_2)的UBD技术来钻探下一节(8 1/2英寸孔尺寸,使用锤子和三晶位)。压缩空气或膜产生的N_2的注射速率范围为2,800至3,400 scfm,雾气泡沫钻孔期间的液体速率为14至16gpm(53至61Lpm)。第一孔中的部分用三个锤子比特和一个三耳针钻孔,平均ROP(包括连接时间)为42 fph(13米/小时)。用锤位观察350 fph(107m / h)范围内的瞬时ROP。钻出了55.5小时的2,378英尺(725米)。在整个UB阶段,渗透率明显大于偏移记录。操作员将从第一个井中吸取的经验教训转发到第二孔中。达到了总共2,750英尺(838米),58.75小时(使用三个锤子比特和一个三耳针)。基于第二井成功,规划是在第三次良好的额外改进方面启动了规划。然而,增强的锤位设计并没有产生有希望的结果;决定钻取剩余部分与三分位。使用四个锤子比特和三个三分位,钻出了61.7小时的3,010英尺(917米)。在UB条件下仅使用特写方位进行第四孔,以比较锤位与三轴位之间的ROP。使用五个三分位,钻出了76.9小时的2,985英尺(910米)。改进的ROP和整体成本节省是客户的主要目标,并实现了。对于钻机船员,用压缩空气或N_2钻孔是一种新的体验。在服务公司人员钻井阶段之前进行了钻机培训

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号