首页> 外文会议>North American Tunneling Conference >Risk Mitigation Strategy for Big Walnut Sewer Extension in Columbus, Ohio
【24h】

Risk Mitigation Strategy for Big Walnut Sewer Extension in Columbus, Ohio

机译:俄亥俄州哥伦布大核桃下水道延伸的风险缓解策略

获取原文

摘要

This project will expand sanitary sewer service within the City of Columbus. It consists of 2.5-mile long, 72-inch finished diameter pipe to be grouted inside 10-foot diameter tunnel excavation in shale. This paper describes the multi-faceted geotechnical exploration during tunnel alignment study to minimize the ground condition risks. The tunnel will cross immediately below a buried valley with minimum cover of poor and highly weathered rock with potential soil-like inclusion. The risk mitigation strategy to cross the valley will be discussed to include contingencies and cost allowances. Design provisions to prevent impact on adjacent groundwater resources as well as other risks will be described.
机译:该项目将在哥伦布市内扩展卫生下水道服务。 它由2.5英里长,72英寸成品直径的管道组成,在页岩的10英尺直径的隧道挖掘内灌浆。 本文介绍了隧道对准研究期间的多面岩土工程探索,以最大限度地减少地面条件风险。 隧道将在埋在埋地山谷的下方交叉,最小覆盖贫困和高度风化的岩石,具有潜在的土壤样板。 将讨论将山谷交叉的风险缓解策略,包括包括突发事件和成本津贴。 将描述防止对邻近地下水资源以及其他风险影响的设计规定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号