The Silicon Valley Clean Water Gravity Pipeline (SVCW) is among the first tunnel projects in the United States to be procured using the Progressive Design Build (PDB) method. Selected by SVCW to provide cost certainty after the 60% design level and to allow greater coordination of the design with operations and maintenance, PDB is being used by SVCW to procure two other major projects-the Front of Plant pump station/headworks facility and the member agency Pump Station Improvements. The three projects are critical to SVCW's Regional Environmental Sewer Conveyance Upgrade (RESCU) program. The PDB process has facilitated a collaborative working relationship between owner, contractor and designer to agree design direction, align scheduling, manage risk and ensure designs incorporate SVCW's RESCU program success factors and contractor means and methods. The flexibility of PDB has allowed early milestones to be achieved during Stage 1, prior to negotiation of the Stage 2 lump sum construction contract. These include placement of the TBM order, 100% design for the precast concrete segmental lining and TBM launch shaft, all of which have significant project schedule impacts. Project successes and challenges of the PDB process are discussed from the Owner, Contractor and Designer perspective.
机译:硅谷清洁水重力管道(SVCW)是使用逐步设计构建(PDB)方法采购的美国第一隧道项目之一。通过SVCW选择,在60%的设计水平后提供成本确定性,并允许更快地协调设计和维护,SVCW使用PDB来采购其他其他主要项目 - 植物泵站/部门设施的前部会员代理泵站改进。这三个项目对SVCW的区域环境下水道运输升级(RESCU)计划至关重要。 PDB流程促进了所有者,承包商和设计师之间的协作工作关系,以同意设计方向,调整调度,管理风险,并确保设计包括SVCW的Rescu计划成功因素和承包商手段和方法。 PDB的灵活性允许在阶段1期间达到早期的里程碑,在阶段的第2阶段一次性施工合同之前。这些包括置于TBM阶的放置,100%设计用于预制混凝土节段衬里和TBM发射轴,所有这些都具有重大的项目进度影响。从所有者,承包商和设计师的角度讨论了PDB过程的项目成果和挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号