Singapore has some experience in the application of NATM for tunnel construction. To date, tunnels of smaller size have been constructed using this technique. The Fort Canning Tunnel is a three-lane vehicular tunnel with a span of approximately 48 feet and is the first wide span tunnel in Singapore constructed by NATM. Its location in soft ground combined with a high groundwater elevation and shallow cover of about 12 feet called for special design considerations in particular in the use of systematic pre-support techniques. A special pre-support umbrella (AGF) consisting of steel pipes and synthetic grouts for ground improvement is utilized. The tunnel design has been developed in close cooperation with the contractor Sato Kogyo in a design-build framework. As a result of the tunnel collapse that occurred on a cut-and-cover construction for Land Transit Authority's subway system the design development was subjected to a rigorous review and checking process.
机译:新加坡在隧道建设中拥有纳米的应用经验。迄今为止,已经使用该技术构建了较小尺寸的隧道。铸造堡隧道是一个三车道的车辆隧道,跨度约为48英尺,是由Natm构建的新加坡的第一宽跨度隧道。它在软土地上的位置与高地下水高程和大约12英尺的浅盖,呼吁特殊设计考虑因素,特别是在使用系统的预支持技术方面。使用由钢管和用于地面改进的合成灌浆组成的特殊预载压织伞(AGF)。隧道设计已经与设计建立框架的承包商Sato Kogyo密切合作开发。由于隧道崩溃发生在土地过境管理局地铁系统的剪切和覆盖建筑上,设计发展受到严格的审查和检查过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号