首页> 外文会议>North American Tunneling Conference >Influence of geologic conditions on excavation methodology
【24h】

Influence of geologic conditions on excavation methodology

机译:地质条件对挖掘方法的影响

获取原文

摘要

The existing MTA-New York City Transit's (MTA-NYCT) No. 7 Subway was built in the early 1900s and currently terminates at Times Square near 41st Street and Seventh Avenue. As part of the City's redevelopment of the west side of Manhattan, the MTA-NYCT's No. 7 Subway extension project will add approximately 1.5-miles of twin tunnel alignment to the current line. The proposed alignment will extend from the existing Times Square Station west beneath 41st Street then turn south under 11th Avenue and terminate between 24th and 25th Streets. The project will include two new stations, a two-track line station near 41st Street and 10th Avenue and a three-track terminal station at 34th Street and 11th Avenue. The alignment lies in close proximity to several major underground structures. The tunnels and station caverns will be constructed in the Manhattan Schist, which has been extensively intruded by pegmatitic and aplitic veins along and across the foliations. The lithology of the bedrock as well as the orientation and condition of the rock mass discontinuities are critical to the design of the tunnel boring machines. This paper will focus on the identification and influence of geology on the selection of excavation methodologies that minimize impact to the adjacent underground structures.
机译:现有的MTA-New York City Transit(MTA-NYCT)第7号地铁建于19世纪初,目前在第41街和第七大道附近的时代广场终止。作为该市重建曼哈顿西侧的一部分,MTA-NYCT的第7号地铁扩展项目将增加大约1.5英里的双隧道对准到当前行。建议的对齐将从第41街下面的现有时代广场站西方延伸,然后在第11大道南部左转,终止于24日和25街之间。该项目将包括两个新电台,这是一个在第41街和第10大道附近的双轨线路站和第34街和第11街的三轨终端站。对准位于几个主要地下结构附近。隧道和车站洞穴将在曼哈顿鸵鸟建造,这已经被佩格玛丽蒂蒂特和甲虫静脉划过和横跨叶子的广泛侵入。基岩的岩性以及岩石质量不连续的方向和条件对隧道镗床的设计至关重要。本文将重点关注地质学对挖掘方法的识别和影响,尽量减少对邻近地下结构的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号