首页> 外文会议>North American Tunneling Conference >Tunneling through an operational oilfield and active faults on the ECIS Project, Los Angeles, CA, USA
【24h】

Tunneling through an operational oilfield and active faults on the ECIS Project, Los Angeles, CA, USA

机译:隧道通过运营油田和ecis项目,洛杉矶,加利福尼亚州,加利福尼亚州,美国

获取原文

摘要

A 2.5km (1.8 mile) long tunnel has been driven by a 4.7m (15.5ft) diameter EPB-TBM through sands and gravels of the Lakewood formation and very stiff massive clays and silts with minor occurrences of sand of the San Pedro formation. The Unit 1, western section, of the East Central Interceptor Sewer (ECIS) project tunnels beneath major utility lines with shallow cover, crosses the seismically active Newport-Inglewood Fault Zone beneath Baldwin Hills, and navigates through the Inglewood Oil Fields. The paper describes the hazard assessment and construction considerations of tunneling through faults and outlines risk avoidance planning to avoid abandoned oil wells. The paper then describes the performance of the TBM in the different ground conditions encountered, the forward probing method used to monitor for gas and the search for existing oil wells using a magnetometer both in a probe hole from the tunnel and also from the surface. Procedures are included describing the re-abandonment of an existing oil well discovered elsewhere on the project, and how successful implementation enabled the project to proceed safely.
机译:2.5公里(1.8英里)长的隧道由4.7米(15.5英尺)直径的EPB-TBM驱动,通过莱克伍德形成的沙子和砾石,非常坚硬的大规模粘土和淤泥,具有三种砂砂的SAN Pedro Mailation。东部中央拦截器下水道(ECIS)项目隧道的第1款,西部隧道与浅封面,穿过鲍德温山下的地震活跃的纽波特木材断裂带,并通过英格尔伍德油田导航。本文介绍了隧道隧穿过滤的危害评估和施工考虑,并概述风险避免计划,以避免被遗弃的油井。然后本文描述了TBM在遇到的不同地条件下的性能,用于监测气体的前进探测方法,并在隧道探头和表面中使用磁力计搜索现有的油井。包括程序描述,描述了在项目上其他地方发现的现有油井以及成功实施项目如何安全地进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号