首页> 外文会议>Society of Petroleum Engineers International Symposium and Exhibition on Formation Damage Control >Continuous Pumping,Multistage,Hydraulic Fracturing in Kitina Field,Offshore Congo,West Africa
【24h】

Continuous Pumping,Multistage,Hydraulic Fracturing in Kitina Field,Offshore Congo,West Africa

机译:连续泵送,多级,液压压裂在Kitina Field,海上刚果,西非

获取原文

摘要

Many West Africa offshore fields are maturing and operators are completing secondary targets in their wells to maintain the economic operation of their valuable assets.Large quantities of reserves can be found in low permeability,consolidated,formations and new techniques are being investigated to improve the economic return of completing these formations.The Kitina Field,offshore from Pointe Noire,Congo,is one such field.Deeper sands have been produced to economic depletion and the operator is looking for alternative production intervals.The targeted reservoir is the 3A Sand at approximately 2200 meters TVD.The reservoir is a very heterogeneous lithology with varying quantities of siltstone,sandstone and calcite.The intervals of better porosity show a decrease in clay content,but the good "sands" can be either dominated by quartz or calcite with substantial variations with each meter of height.Three candidate wells were selected for placing multiple propped fractures using a technique that has been used for six years in North America.This technique utilizes a series of mechanical packers and frac ports that are sequentially shifted "on the fly" allowing continuous placement of more than one hydraulic propped fracture without shutting down the pumping equipment.During April to June of 2007,eight hydraulic propped fractures were placed in three re-completed,cased-hole wells in the Kitina Field with very encouraging production increases.During the first 90 days of post fracturing production,a production increase of 200% was achieved.This paper will discuss the steps that were taken to place these propped fractures from an ocean going tender barge using skid equipment and recommendations for the future applications of this stimulation technique.
机译:许多西非的海上油田的成熟和运营商都完成了他们的井保有储量的的宝贵assets.Large量的经济运行次要目标可以在低渗透发现,整合,形成和新技术正在研究改善经济返回来自刚果黑角,在完成这些formations.The Kitina场,近海的是一种这样的field.Deeper砂已经生产出经济消耗和操作者在寻找替代生产intervals.The靶向储层是3A砂在约2200米TVD.The水库是一个非常庞杂的岩性与不同数量的粉砂岩,砂岩和更好的孔隙度calcite.The间隔显示粘土含量下降,但好“金沙”可以通过石英或方解石与实质性的变化而无论是占主导地位选择height.Three候选井的每米使用的技术将多个支撑裂缝已经使用了六年北America.This技术利用了一系列的机械封隔器和压裂端口顺序“对飞”,允许一个以上的水力支撑裂缝的连续布局转移,而无需关闭抽equipment.During四月到2007年六月,八米液压支撑的裂缝被放置在三个重完成后,在Kitina场套管井井非常鼓励生产increases.During前90天压裂后生产,达到了200%的产量增长。本文将讨论采取从海洋使用防滑设备和建议这种刺激技术的未来应用将会招标驳船将这些支撑裂缝的步骤。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号