A study on key technology and demonstration application of UHV AC site assembled transformers

机译:UHV AC站点组装变压器关键技术与示范应用研究

获取原文

摘要

Many UHV AC power transmission projects have been put into commercial operation successfully in China. By the end of 2017, the backbone of UHV AC power grid has been built in the vast area of Sanhua (North, Central and East China). As a key equipment, more than 150 units of UHV AC transformers (single unit capacity of 1,000 MVA) had been put into operation successfully because of their excellent qualities in design, process, manufacturing, testing, transportation, installation, acceptance test and system commissioning etc., which ensures the stability and reliability of UHV AC power grid till now. However, due to the large size and heavy weight of UHV AC transformers, how to ensure safe and reliable transportation has always been a difficult problem needs to be noticed and addressed. Therefore, in order to meet the requirement of different transportation environment and transportation conditions, a site assembled transformer bank (in three-phase) have been put into operation as an demonstration application installed at the Jin-Zhong UHV AC substation of a UHV AC project from Shaanxi to Shandong in China. As a result, a series of technical problems have been successfully solved in split transportation and field assembly, and formed the general technical route of plant disintegration, split transportation, field assembly and final installation on concrete foundation. In this paper, achievements and experiences would be presented in key technology research, installation and acceptance test, system commissioning and trial operation of site assembled transformers. Feasibility and reliability of such kind of transformers would also be discussed deeply for UHV AC power transmission projects.
机译:许多UHV交流电力传输项目已在中国成功投入商业运营。截至2017年底,UHV交流电网的骨干在三华地区(北部,中部和华东)建造。作为一个关键设备,超过150个单位的UHV交流变压器(单位单元容量为1,000 MVA),由于它们的设计,工艺,制造,测试,运输,安装,验收测试和系统调试,它们的优异品质已成功投入运营。等,确保了直到现在的UHV交流电网的稳定性和可靠性。然而,由于UHV交流变压器的大尺寸和重量,如何确保安全可靠的运输一直是难题需要注意并解决。因此,为了满足不同的运输环境和运输条件的要求,一家站点组装的变压器银行(三相)已作为安装在UHV交流项目的金钟UHV AC变电站的演示应用程序。从陕西到山东在中国。结果,在分开的运输和现场组装中已经成功解决了一系列技术问题,并形成了植物崩解,分体式运输,现场装配和混凝土基础的最终安装的一般技术途径。在本文中,将在关键技术研究,安装和验收测试,站点组装变压器的系统调试和试验中提出了成就和经验。这种变形金刚的可行性和可靠性也将深入讨论UHV交流电力传输项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号