PROPOSED METHODS FOR RECORDING AND ANALYZING OF TRANSMISSION LINES AND SUBSTATIONS OUTAGES FOR RELIABILITY ANALYZING AND IDENTIFYING THE UNRELIABLE POINTS OF THE POWER SYSTEM

机译:所提出的方法,用于记录和分析传输线和变电站的可靠性分析和识别电力系统的不可靠点

获取原文

摘要

Recording and analyzing outages of power systems is a useful tool that clears how the power system has worked in the past; this is the best way to recognize all unreliable points in the system. Other important result is to obtain components reliability indices that are the first needs of reliability evaluation in the power system. For reliability studies, the power system is divided in to 3 parts: generation, transmission and distribution. Because of these divisions that are based on the power systems structures and functions, the outages details must be recorded and analyzed separately. This project has been done by the authors for the transmission networks because these are very important and extended in Iran's power system. The project has been done for 2 of the largest regional electric companies in Iran for the time period of 4 years. The results of this studying are as follows: Determining the information items that must be recorded in every outages for transmission lines and substations to achieve their component reliability indices. Designing transmission lines and substations outages forms completely and comprehensively so that entering and processing data can be easy in the software. Designing transmission lines and substations suitable outputs reports from the outage database for evaluating reliability and detecting unreliable points of the system. Preparing the transmission system outages database software as the following capabilities: Possibility of entering transmission line and substation outages according to designed forms. Calculating the reliability indices for all transmission line and substation components for modeling transmission system instruments in reliability studies. Calculating the power delivery indices for all transmission network in each studying year separately. (By studying the indices changes procedure during the years it can be found that how the development plans and the network operation move better.) Calculating the power delivery indices due to all outages of each transmission line and substation in every studying year separately. (By sorting these indices can be detected which line or substation outage is caused the most interruption in past year. This shows that which line or substation is the weakness of power delivery to customers or the unreliable points of the system.) Reporting the different statistical reports in graphical or text mode from the number and cause of interruptions in transmission lines and substations. e. Studying reliability for the two of the regional electric companies of Iran's power system. This paper is introduced a suitable method for recording and analyzing the outages, evaluating reliability and detecting the unreliable points of the network. Also it emphasizes on some new suggestions as follow: Suggestion a new method for calculating the component reliability indices such as λ, concerning to annual extension of the network and increase of components numbers. Suggestion some new indices for the power delivery to customers such as LOE, ASCI, ASAI, CAIDI, ASIDI and ASIFI due to outages of each substation and transmission line per year to detect the weak or unreliable points of the transmission network. There are some samples from the designed forms and the results reports are attached.
机译:记录和分析电力系统的中断是清除动力系统是如何在过去的工作的一个有用工具;这是认识到系统中的所有不可靠点的最佳途径。其他重要的结果是获得部件可靠性指标是可靠性评估在电力系统中的第一需求。的可靠性的研究中,电力系统被划分到3个部分:发电,输电和配电。因为这些部门是基于电力系统结构和功能的细节停电必须记录,并分别进行分析。该项目已被作者的传输网络完成,因为这些都是非常重要的,在伊朗的电力系统扩展。该项目已经做了最大的区域性电力公司2在伊朗的4年时间。是这个研究的结果如下:确定必须被记录在每一个中断输电线路和变电站的信息项目,以实现其组件的可靠性指标。设计传输线路和变电站的中断的形式完全和全面地使进入和处理的数据可以在软件中容易。设计从停电数据库传输线路和变电站合适输出报告用于评估的可靠性和检测系统的不可靠的点。准备传输系统中断数据库软件为以下功能:根据设计形式进入传输线和变电站中断的可能性。计算所有的输电线路和变电站的部件可靠性指标的可靠性研究模型传输系统仪器。计算在每个单独学习一年的所有传输网络的电力输送指数。 (通过在这些年来研究指数的变化过程可以发现,如何发展计划和网络运行移动更好。)由于每个单独学习一年各输电线路和变电站停运所有计算电力输送指数。报告中不同的统计(通过整理这些指标能够检测到线路或变电站停运造成在过去的一年中最中断,这表明该线路或变电站是电力输送给客户或系统的不可靠点的弱点。)在从传输线路和变电站的中断的数量和原因的图形或文本模式报告。 e。攻读两个伊朗的电力系统的区域电力公司的可靠性。本文介绍了用于记录和分析故障,可靠性评估和检测网络的不可靠的点的合适方法。此外,它强调了一些新的建议如下:建议计算部件的可靠性指标,如λ,涉及到每年扩展网络和组件数量增加了新的方法。建议对电力输送到客户,如LOE,ASCI,ASAI,CAIDI,ASIDI和ASIFI由于每年每个变电站和输电线路停运了一些新的指标来检测传输网络的薄弱或不可靠的点。还有从设计形式的一些样品和结果的报告附后。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号