Development of improved aggregated load models for power system network planning in the Nordic power system Part 2: Method verification

机译:开发北欧电力系统电力系统网络规划改进的汇总载型模型第2部分:方法验证

获取原文

摘要

In this paper, we describe the results from an ongoing project to update the modelling strategies of load models used for planning purposes by the Nordic Transmission System Operators (TSOs) Svenska kraftnat, Fingrid & Statnett. The background to this project and a description of the development of this methodology was published as Part 1 of this set of papers, presented at the Cigre 2016 Session [1]. During 2016, the methodology has been through a verification phase which is partly presented in [2] and [3] with further details presented in this paper. The load response to voltage and frequency changes may have a significant impact on the dynamic behaviour of the power system. In this sense, the selection of load model structures and load model parameterisation gain an increased interest as power systems are operated closer to their limits. Modelling of loads is however highly complex due to the vast number of load devices in a power system, making it unfeasible to model each device separately as well as making it unfeasible to model each possible loading scenario. Based on this, a methodology for development of load models has been presented in [1]. In the work with validating this methodology, several challenges as well as strengths of the method have been identified. For the voltage dependency of the active power part of the load, the validation successfully provided evidence of the validity of the method. For reactive power, only a partial validation could be performed due to limited level of reactive power in gathered measurements. The load model structure used in this project is identified as a limiting factor for the representation of the non-linear behaviour of this part of the load. Frequency dependency of load has only been addressed to a limited extent, with results illustrating the difficulties to assess this kind of behaviour from measurements gathered during this project. All in all, from the results of the validation it is found that the method is suitable to be employed on a larger scale with some differences in approach regarding the assessment of the voltage and frequency behaviour of the load. Furthermore, this work has provided valuable input for the understanding of the behaviour of the load.
机译:在本文中,我们描述了持续项目的结果,以更新用于规划目的的负载模型的建模策略,用于由北欧传输系统运营商(TSOS)Svenska Kraftnat,Fingrid&Statnett的规划目的。该项目的背景和对该方法的发展的描述被公布为这套论文的第1部分,在CIGRE 2016会议上提出[1]。在2016年期间,该方法通过验证阶段进行了验证阶段,该阶段部分介绍在[2]和[3]中,本文提出了进一步的细节。对电压和频率变化的负载响应可能对电力系统的动态行为产生显着影响。从这个意义上讲,随着电力系统更靠近它们的限制,加载模型结构和负载模型参数的选择增加了增加的兴趣。然而,由于电力系统中的大量负载设备,负载的建模非常复杂,因此可以单独模拟每个设备,并使每个可能的加载方案模拟每个设备不可行。基于此,在[1]中介绍了负载模型的开发方法。在验证该方法的工作中,已经确定了几种挑战以及方法的优势。对于负载的电压依赖性的电压依赖性,验证成功提供了方法的有效性的证据。对于无功功率,由于收集的测量中的无功功率水平有限,因此只能执行部分验证。该项目中使用的负载模型结构被识别为负载这部分的非线性行为的表示的限制因素。载荷的频率依赖性仅在有限的程度上被解决,结果说明了评估在该项目期间收集的测量的这种行为的困难。总而言之,从验证结果中发现,该方法适合于更大的规模采用较大规模,这方面有一些关于负载的电压和频率行为的方法的差异。此外,这项工作为了解负载的行为提供有价值的投入。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号