首页> 外文会议>CIGRE Session >400 KV VIENNA THE VIENNA 400 KV NORTH INPUT
【24h】

400 KV VIENNA THE VIENNA 400 KV NORTH INPUT

机译:400 kV维也纳维也纳400 kV北投投入

获取原文

摘要

Between 1978 and 1986 Wienstrom has built three 400 kV FF-cable links (south input) in Vienna (transmission station Pfarrgasse - substation Sued; substation Sued - substation Kendlerstrasse, substation Kendlerstrasse - power station Simmering), consisting of two three-phase circuits each with 1.200 mm~2 Co FF cables. Until today it is the only EHV connection for the city of Vienna. Depending on the actual increasing consumption of electricity, 2% per year as an average, Wienstrom started in the early 90th planning a new 5,2 km long 400 kV cable input, combined with a new 9,1 km long 400 kV overhead line, in the northern area of the city of Vienna. In the pre-bid stage the following different solutions were foreseen (e.g. FF - PPL - XLPE). Main technical issues: Two transmission capacities were required by Wienstrom (600 MVA without cooling system and 1.040 MVA by using a lateral cooling system with water pipes). Program of the project: The civil works started in March 2004 and the commissioning was in November 2005. The present paper includes a description of the EHV Cable system, etc. There are two three-phase circuits, etc. The XLPE Cable consists of a 1200 mm~2 copper conductor, XLPE insulation, copper wires screen in combination with welded aluminum sheath firmly bonded to the outer polyethylene sheath. The metallic sheaths are connected in a Cross-Bonding system, etc. There are six laying sections for each system with cable lengths from 850 to 890m. The cables are laid in open trefoil with a depth of 2,7 m. All joints are installed in accessible joint bays.
机译:1978年至1986年间维也纳在维也纳建立了三个400 kV FF-Cable Link(南投)(传输站Pfarrgasse - 变电站);变电站Sued - 变电站Kendlerstrasse,变电站Kendlerstrasse - Power Station Simmering),包括两个三相电路带1.200毫米〜2 CO电缆。直到今天,它是维也纳市唯一的EHV连接。根据电力消耗的实际增加,每年2%的平均水平,维也纳初期始于第90届规划新的5,2公里长400 kV电缆输入,结合新的9,1公里长400 kV架空线,在维也纳市的北部地区。在预先出价阶段,预见以下不同的溶液(例如FF - PPL - XLPE)。主要技术问题:通过使用水管的横向冷却系统,维也纳(无需冷却系统和1.040 MVA的600 MVA)所需的两个传输能力。项目计划:民办工程于2004年3月开始,调试在2005年11月。本文包括EHV电缆系统的描述等。有两个三相电路等。XLPE电缆包括一个1200 mm〜2铜导体,XLPE绝缘,铜线筛与焊接铝护套牢固地粘合到外聚乙烯护套。金属护套在交叉键合系统中连接等。每个系统都有六个铺设部分,电缆长度为850至890m。电缆铺设在开放的三叶草中,深度为2,7米。所有接头都安装在可访问的联合托架中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号