首页> 外文会议>CIGRE Session >Increase in transmission capacity in high-voltage power lines on the Levante (Eastern Spain) coastal path
【24h】

Increase in transmission capacity in high-voltage power lines on the Levante (Eastern Spain) coastal path

机译:左岸(西班牙东部)沿海路径上的高压电力线路传输容量增加

获取原文

摘要

In response to the growing demand for electricity in recent years along the coast of the Autonomous Region of Valencia and delays in processing applications for and constructing the numerous lines planned in the area to meet the new needs of the grid, IBERDROLA DISTRIBUCION ELECTRICA (IDE) conducted a study on possible short-term measures to be adopted with a view to safeguarding the supply of electricity to the area during the holiday seasons in 2002 and 2003. Maximum demand for the summers of 2002 and 2003 was estimated by taking peak demand data for summer 2001 and then increasing it by 4% and 8% respectively. Table 1 below shows the demand situation in the most critical circuits during normal operations using the connection system and in various n-1 fault hypothesis for summer 2003 and the electrical path in question (See Plan 1).
机译:在近年来沿着瓦伦西亚自治区沿海沿着近年来对电力日益增长的需求,并延迟加工应用程序,建设该地区计划的众多线路,以满足网格的新需求,IBerdra分布电气(IDE)对可能的短期措施进行了研究,以期在2002年和2003年在假日季节向该地区提供电力供应。通过占据需求数据的最高需求数据估计了2002年和2003年夏季的最大需求2001年夏天,然后将其增加4%和8%。下面的表1显示了使用连接系统的正常操作期间最关键电路的需求状况,并在2003年夏季夏季的各种N-1故障假设和有问题的电气路径(参见计划1)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号