Remote start-up facility is initiated and implemented at some of Petronas Carigali Sdn Bhd (PCSB) offshore installation as one of the initiative to reduce production deferment and optimize resources. Conventionally, operation’s personnel are required to visit the remote platform to perform the local/manual start-up activity whenever the platform has shutdown due to process or other abnormality. The process upset may be originated from the platform itself or due to cascading effect from receiving platform after it has shutdown. During bad weather, the traveling time by boat to the remote platform is difficult and normally takes longer traveling time. There are also cases where the start-up activity needs to wait on weather when the traveling by boat is not possible due to rough sea. The delay due to traveling time and further delay during bad weather cause the delay in restarting-up the platform. This start-up delay results in production deferment. The implementation of the remote start-up facility will enable the operation’s personnel to remotely start-up the drilling platform. It is then no longer required to travel to the platform for local/manual start-up activity. Based on the study conducted, the restart-up delay due to traveling time contributes significantly to the production deferment. Therefore, if the start-up activity can be done from remote I.e. from mother platform or FPSO, then the production deferment can be reduced significantly.By having remote start-up facility, the total downtime and thus production deferment could be minimized not only during bad weather condition but also during normal weather condition as the travel to the platform is no longer required. This production deferment would accumulate from year to year if not being addressed. This facility has been implemented on MASA platforms where existing control and safety shutdown systems were modified together with additional instrumentations installed. Only minor modification at relatively marginal cost was required but yet capable of generating relatively significant reduction in deferment. At MASA platforms, the remote start-up facility is initiated from the FPSO by opening the respective surface safety valves (SSV), Shutdown Valves (SDV) and Choke Valves (CV).
机译:在一些Petronas Carigali Sdn Bhd(PCSB)海上安装中启动和实施了远程启动设施,作为减少生产延迟和优化资源的主动性之一。传统上,操作的人员需要访问远程平台,以便在平台由于过程或其他异常而关闭平台时执行本地/手动启动活动。过程镦锻可以源自平台本身,或者由于在其关闭之后从接收平台接收平台而导致的级联效果。在恶劣天气期间,乘船到远程平台的旅行时间很困难,通常需要更长时间的行驶时间。还有案件在乘船旅行时需要在天气等待天气时,由于汹涌的大海是不可能的。在恶劣天气期间旅行时间和进一步延迟的延迟导致延迟重新启动平台。这种启动延迟会导致生产延迟。远程启动设施的实现将使操作的人员远程启动钻井平台。然后不再需要前往本地/手动启动活动的平台。基于进行的研究,由于旅行时间导致的重启延迟显着贡献了生产延迟。因此,如果启动活动可以从遥控器完成。来自母亲平台或FPSO,生产延迟可以显着减少。具有远程启动设施,总停机时间和因此,不仅在恶劣的天气状况期间,也可以在正常的天气状况期间作为旅行到行驶不再需要平台。如果没有被解决,这次生产延迟将从一年中积累。该设施已在MASA平台上实施,其中现有的控制和安全关闭系统与安装的附加仪器一起修改。只需要在相对边际成本下进行微小的修改,但尚未产生相对显着的延期减少。在MASA平台上,通过打开各个表面安全阀(SSV),关闭阀(SDV)和扼流圈(CV),从FPSO启动远程启动设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号