Remote start-up facility is initiated and implemented at some of Petronas Carigali Sdn Bhd (PCSB) offshore installation as one of the initiative to reduce production deferment and optimize resources. Conventionally, operation’s personnel are required to visit the remote platform to perform the local/manual start-up activity whenever the platform has shutdown due to process or other abnormality. The process upset may be originated from the platform itself or due to cascading effect from receiving platform after it has shutdown. During bad weather, the traveling time by boat to the remote platform is difficult and normally takes longer traveling time. There are also cases where the start-up activity needs to wait on weather when the traveling by boat is not possible due to rough sea. The delay due to traveling time and further delay during bad weather cause the delay in restarting-up the platform. This start-up delay results in production deferment. The implementation of the remote start-up facility will enable the operation’s personnel to remotely start-up the drilling platform. It is then no longer required to travel to the platform for local/manual start-up activity. Based on the study conducted, the restart-up delay due to traveling time contributes significantly to the production deferment. Therefore, if the start-up activity can be done from remote I.e. from mother platform or FPSO, then the production deferment can be reduced significantly.By having remote start-up facility, the total downtime and thus production deferment could be minimized not only during bad weather condition but also during normal weather condition as the travel to the platform is no longer required. This production deferment would accumulate from year to year if not being addressed. This facility has been implemented on MASA platforms where existing control and safety shutdown systems were modified together with additional instrumentations installed. Only minor modification at relatively marginal cost was required but yet capable of generating relatively significant reduction in deferment. At MASA platforms, the remote start-up facility is initiated from the FPSO by opening the respective surface safety valves (SSV), Shutdown Valves (SDV) and Choke Valves (CV).
机译:远程启动设施在Petronas Carigali Sdn Bhd(PCSB)的一些海上设施中启动并实施,这是减少生产延期并优化资源的一项举措。通常,每当平台由于过程或其他异常而关闭时,操作人员都必须访问远程平台以执行本地/手动启动活动。进程异常可能源自平台本身,也可能是由于其关闭后接收平台的级联效应引起的。在恶劣天气下,乘船到远程平台的旅行时间很困难,通常需要更长的旅行时间。在某些情况下,由于崎sea的海上无法乘船旅行​​,因此启动活动需要等待天气。由于行驶时间造成的延迟以及恶劣天气期间的进一步延迟会导致重新启动平台的延迟。该启动延迟导致生产延期。远程启动设施的实施将使操作人员可以远程启动钻井平台。这样就不再需要前往平台进行本地/手动启动活动。根据进行的研究,由于行进时间而导致的重新启动延迟极大地影响了生产延期。因此,如果可以从远程进行启动活动,即通过使用远程启动设备,不仅可以在恶劣的天气条件下,而且在正常天气条件下,由于去往工厂的旅途而使总停机时间和生产延误最小化,因此可以大大减少生产延误。平台不再是必需的。如果不解决,这种生产延期将逐年累积。该功能已在MASA平台上实施,在该平台上,现有的控制和安全关闭系统已进行了修改,并安装了其他仪表。仅需要以相对较小的成本进行较小的修改,但仍可以产生相对较大的延期减少。在MASA平台上,通过打开相应的表面安全阀(SSV),关闭阀(SDV)和节流阀(CV)从FPSO启动远程启动设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号