首页> 外文会议>POWER-GEN International Conference >Generating Availability Data system(GADS): Streamlining the Reporting Process and Aligning NERC GADS Availability Reporting with IEC 61400-26 Reporting(PPT)
【24h】

Generating Availability Data system(GADS): Streamlining the Reporting Process and Aligning NERC GADS Availability Reporting with IEC 61400-26 Reporting(PPT)

机译:生成可用性数据系统(GADS):简化报告过程并对齐NERC GAD可用性报告与IEC 61400-26报告(PPT)

获取原文

摘要

GeneratingAvailabilityDataSystem(GADS)requireswindfarmstoreportgenerationinformationtoNERC’sGADSWindReportingapplication.GADSrequiresthatwindplantswithatotalcapacity75MWorlargertoprovidedetailedresourcesavailabilityonaquarterlybasis.NERCGADSisaNorthAmericanrequirement,affectingtheUSandCanadianWindfarms.NERC GADS Reporting Requirements for Wind Plants: 1.The reporting requirement is mandated according to the plant rating.2.Voluntary reporting begins January 1,2017.3.Mandatory reporting begins for wind plants with a total capacity 200 MW or larger begins January 1,2018.4.Mandatory reporting begins for wind plants with a total capacity between 100 MW and 199.99 MW begins January 1,2019.5.Mandatory reporting begins for wind plants with a total capacity between 75 MW and 99.99 MW begins January 1,2020.
机译:GeneratingAvailabilityDataSystem(GADS)requireswindfarmstoreportgenerationinformationtoNERC'sGADSWindReportingapplication.GADSrequiresthatwindplantswithatotalcapacity75MWorlargertoprovidedetailedresourcesavailabilityonaquarterlybasis.NERCGADSisaNorthAmericanrequirement,用于风力发电设备affectingtheUSandCanadianWindfarms.NERC GADS报告要求:1,报告要求,根据植物rating.2.Voluntary报告规定开始一月1,2017.3.Mandatory报告开始风总容量200 MW或更大的植物开始于1月1日1月1日1月1日.4.4.1月1日,200 MW和199.99 MW的总容量开始于1月1日开始,20019.5开始的植物开始于1月1日开始,以75兆瓦的总容量开始,总容量开始和99.99 MW开始于1月1日1月1日。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号