American Electric Power's Conesville Generating Station has had a history of chronic problems with river sediment build-up at the river intake structure. This paper describes modifications that were completed to the area in front of the intake and to the upstream riverbank that successfully eliminated the sedimentation problems. Analytical and hydraulic model studies conducted during the design optimization process and construction techniques utilized to minimize impact to the operating generating station will also be reviewed.
展开▼