首页> 外文会议>CIGRE Symposium >OVERVIEW OF THE FIRST REPORT OF WORKING GROUP C1.03
【24h】

OVERVIEW OF THE FIRST REPORT OF WORKING GROUP C1.03

机译:第一个工作组C1.03的第一份报告概述

获取原文

摘要

C1.3 was established in 2002 to investigate and report on the issues in planning electrical systems with the increasing uncertainties created by shifts in power generation type and volatility of interconnector flows. The Working Group reported that the most urgent need is to assess how power system planning can proceed with high levels of embedded generation and noted that wind power is the fastest growing renewable source. It concluded that it should focus its initial efforts in understanding how the variability and technical uncertainties effect power system planning. This paper is therefore a brief summary of two years of work on that subject by the Working Group. Further Reports will be issued on the subject of "Planning with Uncertainty in Traditional Generation" and "Planning with Uncertainty in Interconnector Flows". Other Working Groups in CIGRE are also tackling some aspects of this work and the Working Group looks forward to seeing whether the thinking of others aligns with its own.
机译:C1.3成立于2002年,调查和报告规划电气系统中的问题,随着发电类型的转变产生的不确定性和互连器流动的波动性。工作组报告说,最迫切需要的是评估电力系统规划如何进行高水平的嵌入式生成,并指出风力是增长最快的可再生源。它的结论是,它应该重点努力了解如何如何变化和技术不确定性效应电力系统规划。因此,本文在工作组上简要概述了这项主题的两年工作。进一步的报告将在“规划在传统一代”和“互联网流动中的不确定性”的主题上发出关于“规划”的主题。 CIGRE的其他工作组也在解决这项工作的某些方面,工作组期待着看到其他人是否与自己对齐。

著录项

  • 来源
    《CIGRE Symposium》|2005年||共8页
  • 会议地点
  • 作者

    LESLIE BRYANS;

  • 作者单位
  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类 TM7-53;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号