Policy Reforms in Geothermal Energy Resource Development and Utilization in the Philippines

机译:菲律宾地热能资源开发与利用的政策改革

获取原文

摘要

This paper describes the policy reforms the Philippines hasundertaken in order to hasten the development and utilization of the country's geothermal energy resource and pursue its goal of energy self-reliance. With vast resources of geothermal energy, the Philippines is one of the leaders in geothermal energy development and utilization particularly in electricity generation. Major policy reforms in 1987 and 1990 set the national policy of allowing private sector participation to construct and operate electric generating plants and sell its power to the grid. Likewise authorizing the financing, construction, operation and maintenance of infrastructure projects by the private sector, brought about a dramatic increase in geothermal plant capacity addition of about 734.39 MW. On the other hand, enactment of the Electric Power Industry Reform Act (EPIRA) in 2001 resulted to the construction of the first merchant power plant in the Philippines. Under this scheme, this plant will sell directly its electricity to large scale consumers and cooperatives. However, in the case of geothermal field development, there is still a need to reform the policy to attract investments. It is expected that once the Renewable Energy Bill is passed into law, it will provide a positive climate for private investment in geothermal field development. On March 11, 2004 and August 31, 2005, the First Geothermal Contracting Round (GEOTHERMAL 1) and the Philippine Energy Contracting Round (PECR) were launched, respectively. This is a new approach on granting new Geothermal Service Contracts through a more transparent and competitive approach. These events are aimed at promoting investment opportunities in the Philippine geothermal industry. The first contracting round resulted to three bids submitted by Marubeni, Mitsui and CPI while the PECR bid submission deadline was set November 2005.
机译:本文介绍了菲律宾Hydertaken的政策改革,以加快该国的地热能资源的开发利用,并追求其能源自力更生的目标。菲律宾凭借广大地热能资源,是地热能源开发和利用的领导者之一,特别是在发电中。 1987年和1990年的主要政策改革设定了允许私营部门参与建造和操作电厂并将其电网销售给电网的国家政策。同样授权私营部门基础设施项目的融资,建设,运营和维护,引起了地热植物能力的巨大增加,增加了约734.39兆瓦。另一方面,2001年电力行业改革法案(Epira)的制定导致菲律宾第一家商业电厂建设。根据本计划,该工厂将直接向大规模消费者和合作社销售。然而,在地热现场发展的情况下,仍然需要改革政策来吸引投资。预计,一旦可再生能源法案被融入法律,它将为地热现场发展的私人投资提供积极的气氛。 2004年3月11日和2005年8月31日,分别推出了第一轮(地热1)和菲律宾能源契约(PECR)。这是一种通过更透明和竞争的方法授予新地热服务合同的新方法。这些活动旨在促进菲律宾地热行业的投资机会。第一个缔约一轮缔约国导致马鲁尼,三井和CPI提交的三项出价,而PE​​CR竞价提交截止日期是2005年11月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号