首页> 外文会议>Geothermal Resources Council Annual Meeting >Geothermal Site Acquisition and Early Development: Key Legal Issues and Emerging Strategies
【24h】

Geothermal Site Acquisition and Early Development: Key Legal Issues and Emerging Strategies

机译:地热网站收购及早期发展:重点法律问题和新兴策略

获取原文

摘要

This paper surveys the recent surge of interest in early-stage geothermal energy project development, describes some of the key legal issues that must be faced by developers of such projects, and recommends strategies for resolving these issues with an eye to facilitating geothermal development in the western United States. The paper includes an assessment of the impacts of geothermal leasing and permitting reform at the Bureau of Land Management and the U.S. Forest Service for projects on federal land. It also reviews the status and efficacy of programs for leasing and permitting exploration of geothermal resources on state owned lands, in particular California, Nevada and Utah. The paper covers key legal issues that have emerged in various states to complicate development (for example, the uneven state treatment of geothermal resources as mineral rights, water rights or neither, and uneven rules regarding their ownership by surface owners, mineral owners, or both). The paper also covers state differences in environmental permitting regimes for geothermal development, as permitting issues have been a substantial cost and time issue, if not a fatal one, for many otherwise attractive projects. Finally, since much geothermal site acquisition occurs through contractual arrangements between larger, well-funded players and smaller, existing developers with rights to the resource at a given site, the paper also focuses on successful, and not so successful, structures for the financing and joint exploration and power plant development on geothermal properties. Structures covered include joint development partnership structures, convertible development loans, and resource unitization under federal and state regulations.
机译:本文调查了最近在早期地热能项目开发中兴趣的兴趣激增,描述了这些项目的开发人员必须面临的一些关键法律问题,并建议解决这些问题的战略,以促进地热发展美国西部。本文包括评估地热租赁和允许改革在土地管理局和美国森林服务中对联邦土地项目的影响的影响。它还审查了租赁方案的现状和有效,允许探索国有土地的地热资源,特别是加州,内华达州和犹他州。本文涵盖了各种国家的复杂发展中出现的关键法律问题(例如,地热资源作为矿产权,水权或既不是矿物权资源的不均匀国家,也不均衡地对其对其所有者的所有权,矿物业主或两者)。本文还涵盖了地热发展的环境允许制度的国家差异,因为许多其他有吸引力的项目,允许问题是一个大量成本和时间问题,如果不是致命的,那么否则是一个致命的项目。最后,由于大量地热网站采集通过较大,资助的球员和较小的现有开发商之间的合同安排发生,因此本文还侧重于成功,而不是如此成功,融资的结构地热性质的联合探索与发电厂发展。涵盖的结构包括联合发展伙伴关系结构,可转换开发贷款和联邦和州法规下的资源集约。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号