Building of a Hot Dry Rock Scientific Power Plant at Soultz-sous-Forets

机译:在Soultz-Sous-Forets的一个热干岩科学发电厂的建设

获取原文

摘要

The European geothermal research program for the extraction of energy from hot dry rocks started at Soultz-sous-Forets in 1987. The test site is located in France on the western edge of the Rhine Graben, some 50 km north of Strasbourg near the German border. The basement, granite, at Soultz lies beneath app. 1400 m of sedimentary rock; the fracture network in the granite has been explored down to 5000 m depth, where temperatures exceed 200 deg C. This scientific pilot plant will use a total of three boreholes of 5000 meters depth each, one injection well and two production wells. All three wells are drilled from the same platform. The wellheads are separated by not more than 6 m. Two out of the three wells are drilled directionally. Between 4500 m and 5000 m depth, the open hole sections of the bore holes have an horizontal spacing of around 600 m. It is expected that by end of 2005 this plant will be able to produce around 50 MW of thermal power at temperatures above 180 deg C. Up to 6 MW of electricity will be produced from this heat. The net output of the power plant is expected to be in the order of 4.5 MWe. The drilling of the 2nd production well GPK4 was finalized at the 11th of April in 2004. The well GPK4 reached a length of 5260 m and a vertical depth of 4982 m, the casing shoe of the floating 9 5/8"casing is at 4756 m measured depth (velence 4489 m True Vertical Depth), the open hole section was drilled in 8 1/2". An extensive suite of logs were acquired in the open hole section of GPK4. GPK4 was kicked off at 2100 m depth, the open hole section is separated app. 1150 m to the south from the wellhead. After the deepening of the 1st production well GPK2 in 1999, the stimulation of GPK2 in 2000, the drilling of the central injection well GPK3 in 2002, the stimulation of GPK3 in 2003 and the drilling of the 2nd production well GPK4 in spring 2004 the underground work of the scientific HDR pilot plant will be finalized with a stimulation of GPK4 and a re-stimulation of GPK3 in summer 2004.
机译:对能源的从苏尔特苏福雷特在1987年的试验场地位于法国上莱茵地堑的西部边缘,斯特拉斯堡靠近德国边境约50公里处开始干热岩开采的地热欧洲研究项目。地下室,花岗岩,在苏茨谎言应用之下。沉积岩1400米;在花岗岩裂缝网络已探索下降到5000米深度,那里的温度超过200℃。这种科学实验工厂将总共使用的每个5000米深度,一个注入井和两个开采井的钻孔3。所有三口井都在同一平台上钻。井口被不多于6米分离。三分之二的三口井都一口定向井。之间4500米和5000米的深度,钻孔的开口孔部具有约600微米的水平间距。预计到2005年底这个工厂将能够在温度高于180℃。最多电力的6 MW将从该热产生,以产生约50兆瓦热功率。发电厂的净输出预计将在4.5兆瓦的顺序。所述第二生产井GPK4于2004年在四月11日最后确定的钻井井GPK4达到5260米的长度和4982米垂直深度,浮动9 5/8" 的套管的套管鞋是在4756米测量深度(Velence的4489米真垂直深度),开放孔部钻8 1/2" 。一个广泛的测井系列在GPK4的开孔部分被收购。 GPK4在2100米深度踢掉,开孔部被分离的应用程序。 1150米从井口南部。第一产于1999年的深化以及GPK2后,GPK2 2000年的刺激下,中央注入井GPK3 2002年钻探,GPK3 2003年的刺激和第二生产在2004年春天的地下钻井GPK4科学HDR试验工厂的工作将GPK4的刺激,2004年夏天GPK3的再刺激敲定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号