首页> 外文会议>International conference on conservation and rehabilitation of dams >Improving flood control capacity of High Aswan Dam and elevation of flooding
【24h】

Improving flood control capacity of High Aswan Dam and elevation of flooding

机译:提高高达湾水坝洪水控制能力及洪水海拔

获取原文

摘要

High floods brought considerable damages with them. Sometimes not only the fields but erosion occurred in the riverbanks and beds. The important navigation on the Nile was seriously hampered. Various schemes for flood protection have been proposed from time to time, but it was limited, because the water passing down the river to the sea exceeded the safe margin. Reached to 162-milliard m~3, of which 41-milliard m~3 specified as flood control capacity, between elev. 175, 182 m U.S. the Dam. If several high floods occur in sequence, the reservoir water level becomes comparatively high. According to instruction of operation for. The High Dam, the flood control capacity must be emptied down to level 175m, before the arrival of the following. Flood, this will result in releasing high discharges, that may reach 350-400 million-m~3/day. In this case, further degradation is expected. This may affect the riverbed, downstream the control structures existing on the river; the canal intakes and water pumping station. To avoid this, it was decided to make use of one of the western valleys (khor Toshka), connecting a huge depression (Toshka Depression) on the western desert to the reservoir, to act as additional spillway named as Toshka Spillway. When the live storage of the lake reached to the max. level (175 m). In spite of this case, the High Dam had been controlled by passing discharges through Toshka Spillway (total 12.60 billion m~3) beside, additional limited discharges D.S. Also the next flood (1999/2000) was high. Max. lake water level reached to (181.60m), which is less than the designed level by only 0.40m. This high flood was also been controlled by passing (14.1 milliard m~3) through Toshka Spillway. Flood of years (2000/2001) and (2001/2002) were above average and high, they had been controlled by passing (8.3, 5.7 milliard m~3) through the spillway. It would cause significant damages. So, Toshka Spillway improved flood control capacity and in conjunction with High Aswan Dam had played an important part in controlling and floods.
机译:高洪水带来了相当大的损害。有时不仅是河岸和床的田间而且发生了侵蚀。尼罗河上的重要导航严重阻碍了。已经不时提出了各种洪水保护计划,但它是有限的,因为将河流到海上的水超出了安全保证金。达到162毫米M〜3,其中41毫米M〜3指定为洪水控制能力,升高。 175,182 m。大坝。如果序列发生几次高洪水,则储层水位变得相对高。根据操作的指令。高坝,洪水控制能力必须在下列抵达前下空到175米。洪水,这将导致释放高放电,可达到350-400百万米〜3 /天。在这种情况下,预期进一步降解。这可能会影响河床,下游在河上存在的控制结构;运河摄入量和水泵站。为避免这种情况,决定利用西谷(Khor Toshka)之一,将西部沙漠的巨大萧条(Toshka抑郁症)连接到水库,作为额外的溢洪道被命名为Toshka Spillway。当湖的现场储存到达最大时。水平(175米)。尽管存在这种情况,但通过Toshka Spillway(总计1260亿m〜3)通过排放,额外有限排放D.S.下一个洪水(1999/2000)很高。最大限度。湖水水平达到(181.60米),小于设计水平仅0.40米。通过Toshka Spillway通过(14.1毫毫米M〜3)来控制这种高洪水。多年(2000/2001)和(2001/2002)的洪水高于平均水平和高,它们通过溢洪道通过(8.3,5.7毫米M〜3)来控制。它会造成重大损害。因此,Toshka Spillway改善了洪水控制能力,与高湾大坝一起发挥了重要组成的控制和洪水。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号