首页> 外文会议>International conference on conservation and rehabilitation of dams >The heightening an arch-gravity dam in Switzerland
【24h】

The heightening an arch-gravity dam in Switzerland

机译:在瑞士在拱门重力坝上升

获取原文

摘要

This paper describes the heightening project of a 114 m high arch-gravity dam by 23 m located in central Switzerland. The heightening of the dam is part of a larger project aimed at optimising the use of hydropower at low cost and minimum risk to investors. The existing structure presents behavioural anomalies which are related to the design and the ageing of the structure and therefore the heightening of the dam also englobes its rehabilitation leading to a dam design which fulfils both future water-retaining objectives and long-term safety requirements. Following an overview of the existing structure, the main project stages leading to the design of the heightened dam are presented. Particular attention is given to the overview project configuration, preliminary dam shape optimisation and monitoring of the structure.
机译:本文介绍了114米高的拱形大坝的提升项目,位于瑞士中部23米。大坝的提高是较大项目的一部分,旨在优化水电费以低成本和投资者的最小风险。现有结构呈现与结构的设计和老化有关的行为异常,因此坝的提高也提高其康复导致坝体设计,该设计符合未来的水保留目标和长期安全要求。在现有结构概述之后,提出了导致设计高坝设计的主要项目阶段。特别注意概述项目配置,初步大坝形状优化和对结构的监控。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号