Development of Design Options for the Installation of 10 Km of Sewer in Very Soft Lacustrian Clays

机译:在非常软的Lapustrian粘土中安装10公里的下水道设计选项的开发

获取原文

摘要

· This paper describes a project that demonstrates the benefits of: · Careful evaluation and acceptance of project alternatives, · Development of a refined alternative, · Using a consultant with specialist expertise and experience · Conception and implementation of a performance specification, · Use of advanced techniques in a developing environment, · Implementation by an experienced designer/contractor. The Project, for Owner EAAB, the water and sewer authority for Bogota, proposed to install a large interceptor sewer running through some rural but largely urban areas. The soils conditions were principally soft Lacustrian deposits of clayey silt or silty clay with a high water content and low shearing resistance extending, most unusually, to 700 m depths in may areas. The conventional scheme that had been developed was based on the construction of an open cut sewer using sheet steel piling with a large pump station close to the start of the sewer section. A review determined that there was sufficient fall between the upstream connection and the outfall to allow a gravity line to be installed. The recommendation was a change of concept on the project to a deep gravity sewer installed by pressure balance tunneling (microtunneling) with depths of installation of between 13 to 24 meters. The estimates developed showed EAAB a USD 10 million saving using tunneling over the projected costs of the pumped scheme at USD45 million. The deep tunneled sewer also eliminated the operation and maintenance costs of the pump station and greatly reduced disruption, potential settlement problems, and with a shortened period of construction compared to the open cut approach. Challenges to be addressed on the design and construction of the project were ongoing global settlements in the general Bogota area, the potential for differential settlements at all interfaces including sewer/shaft interfaces, sewer and shaft settlement with 700 m of underlying soft clay to consider and a high level of seismic activity. The bid was let as a "design and construct" contract based on tight performance specification and quality control regime. The successful bidder opted for a jacked pipe solution at USD 35M, which was within the 3% of the cost estimated. The work was completed with out any real problems within the schedule and contract price.
机译:·本文介绍了一个展示的项目:·仔细评估和接受项目替代品,·制定精制替代方案,·使用专业专业知识和经验的顾问·绩效规范的概念和实施,·使用先进在发展环境中的技术,·由经验丰富的设计师/承包商实施。该项目,对于所有者EAB,Bogota的水和下水道权威,建议安装一位贯穿一些农村但主要城市地区的大型拦截下水道。土壤条件主要是粘土淤泥或粉质粘土的软山脉沉积物,具有高水含量和低剪切抗性,最异常地延伸至5月份的700米深度。已经开发的传统方案是基于使用钢板堆放的开口下水道的构造,其中一个靠近下水道部分的开始。审查确定上游连接与排排之间有足够的跌落,以允许安装重力线。该建议是将项目的概念更改为由压力平衡隧道(Microtunneling)安装的深度重力下水道,安装在13至24米之间。估计显示EAB A EAB A使用隧道施加量为1000万美元,从而超过泵浦方案的预计成本为450万美元。深隧道下水道还消除了泵站的运行和维护成本,大大降低了中断,潜在的沉降问题,与开放式切割方法相比,缩短了施工时期。项目设计和建设的挑战在普通波哥大地区正在进行全球定居点,所有接口的差异定居点的可能性,包括下水道/轴界面,下水道和轴沉降,具有700米底层软粘土来考虑和高水平的地震活动。基于严格的性能规范和质量控制制度,该投标作为“设计与构建”合同。成功的投标人选择了35米USD 35米的千斤顶管溶液,这在估计成本的3%范围内。该工作已完成,并在日程安排和合同价格内进行任何实际问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号