Development of Design Options for the Installation of 10 Km of Sewer in Very Soft Lacustrian Clays

机译:开发在非常软的Lacustrian粘土中安装10 Km下水道的设计方案

获取原文
获取原文并翻译 | 示例

摘要

1. This paper describes a project that demonstrates the benefits of: 2 .Careful evaluation and acceptance of project alternatives, 3. Development of a refined alternative, 4. Using a consultant with specialist expertise and experience 5. Conception and implementation of a performance specification, 6. Use of advanced techniques in a developing environment, 7. Implementation by an experienced designer/contractor. 8. The Project, for Owner EAAB, the water and sewer authority for Bogota, proposed to install a large interceptor sewer running through some rural but largely urban areas. The soils conditions were principally soft Lacustrian deposits of clayey silt or silty clay with a high water content and low shearing resistance extending, most unusually, to 700 m depths in may areas. The conventional scheme that had been developed was based on the construction of an open cut sewer using sheet steel piling with a large pump station close to the start of the sewer section. A review determined that there was sufficient fall between the upstream connection and the outfall to allow a gravity line to be installed. The recommendation was a change of concept on the project to a deep gravity sewer installed by pressure balance tunneling (microtunneling) with depths of installation of between 13 to 24 meters. The estimates developed showed EAAB a US$ 10 million saving using tunneling over the projected costs of the pumped scheme at $45 million. The deep tunneled sewer also eliminated the operation and maintenance costs of the pump station and greatly reduced disruption, potential settlement problems, and with a shortened period of construction compared to the open cut approach. Challenges to be addressed on the design and construction of the project were ongoing global settlements in the general Bogota area, the potential for differential settlements at all interfaces including sewer/shaft interfaces, sewer and shaft settlement with 700 m of underlying soft clay to consider and a high level of seismic activity. The bid was let as a "design and construct" contract based on tight performance specification and quality control regime. The successful bidder opted for a jacked pipe solution at US$ 35M, which was within the 3 % of the cost estimated. The work was completed with out any real problems within the schedule and contract price.
机译:1.本文描述了一个项目,该项目演示了以下优点:2.。仔细评估和接受项目替代方案; 3.开发完善的替代方案; 4.使用具有专业知识和经验的顾问5.绩效规范的概念和实施,6.在开发环境中使用先进技术,7.由经验丰富的设计师/承包商实施。 8.该项目针对波哥大的自来水和下水道当局EAAB业主,建议安装一条穿越某些农村但大部分为城市地区的大型拦截器下水道。土壤条件主要是粘土质粉砂质或粉质黏土的软质Lacustrian沉积物,含水量高,抗剪强度低,最常见的是在可能的地区延伸至700 m深度。已经开发出的常规方案是基于使用钢板桩建造明渠的下水道,并在下水道段的起点附近设有大型泵站。审查确定上游连接口和排水口之间有足够的落差,可以安装重力线。建议是将项目概念更改为通过压力平衡隧道(微隧道)安装的深重力下水道,安装深度在13至24米之间。估算得出的结果显示,EAAB使用隧道技术节省了1,000万美元,而抽水方案的预计成本为4,500万美元。与明挖法相比,深埋的隧道式下水道还消除了泵站的运营和维护成本,并大大减少了干扰和潜在的沉降问题,并缩短了工期。该项目的设计和施工中要解决的挑战是波哥大总区正在进行的全球定居点,包括下水道/竖井接口,下水道和竖井沉降在内的所有界面以及700 m底层软黏土的潜在沉降考虑和解决的潜力。高水平的地震活动。根据严格的性能规格和质量控制制度,将招标书作为“设计和建造”合同。中标者选择了3500万美元的顶管解决方案,这在估计成本的3%之内。工作已经完成,在进度表和合同价格范围内没有任何实际问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号