THE PRINCESS ANNE ATHLETIC CENTER PROJECT: DEMOLITION AND SITE CLEARANCE PHASES

机译:安妮公主运动中心项目:拆迁和网站清关阶段

获取原文

摘要

The Demolition and Site Clearance Phases of the 4.5-acre, USD470,000, Princess Anne Athletic Center Project included the demolition of the 25,000 square feet old factory building - the roof, ceiling, walls, and concrete floor slabs, the dismantling and removal of 29 large steel and 2 fiber glass vertical and horizontal storage tanks, their support structures and concrete foundations with all related fixtures, heavy brush and undergrowth and all other mounted structures and sheds and the disposal of all items in appropriate landfills and recycling centers. This project is funded by the Historically Black Colleges and Universities (HBCU) -US Department of Housing and Urban Development (HUD) program and the Maryland Department of Natural Resources. The work in this phase included the preparation of a Request for Proposal which was used to prepare a bid package that was processed through the Maryland Contract System. This culminated in the award of a contract to a local demolition company. Over 300 tons of scrap metal were removed from the site for recycling. Environmental issues of soil contamination and a 1000-gallon tank full of heating oil buried under the factory's concrete floor slab were addressed and students and faculty of the Construction Management Technology Program were involved in several aspects of this phase of the project. The local community was also involved in this project; several meetings were held by the Project Management and Evaluation Committee and a community activity was held on the project site to heighten awareness and encourage community involvement in the planning of the project. Challenges, successes, related issues of executing the project and a brief description of the work being done in the Site Planning and Development Phase are highlighted in this paper.
机译:4.5英亩,470,000美元,公主安妮运动中心项目的拆迁和现场清关阶段包括拆迁25,000平方英尺的旧工厂建筑 - 屋顶,天花板,墙壁和混凝土楼板,拆除和拆除29大型钢和2个纤维玻璃垂直和水平储罐,它们的支撑结构和混凝土基础与所有相关的夹具,重型刷子和灌木丛以及所有其他安装的结构和棚屋以及所有物品的处置以及适当的垃圾填埋场和回收中心的所有物品。该项目由历史上历史上的黑人高校(HBCU)-US -US和城市发展部(HUD)计划和马里兰州自然资源部提供资金。本阶段的工作包括编写用于准备通过马里兰州合同系统处理的投标套餐的提案请求。这在颁发了当地拆迁公司的合同中宣布。从部位移除超过300吨的废金属进行回收。解决了土壤污染的环境问题和1000加仑坦克埋藏在工厂混凝土板块下埋藏的加热油,并涉及该项目该项目的若干方面的学生和施工管理技术计划的若干方面。当地社区也参与了这个项目;项目管理和评估委员会举办了几次会议,并在项目现场举行了社区活动,以提高意识,并鼓励社区参与项目规划。本文突出了挑战,成功,执行项目的相关问题以及在现场规划和开发阶段所做的工作简要说明。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号