首页> 外文会议>International Oil Spill Conference >RISK BASED PLANNING WILL YOUR REGULATORY COMPLIANT PLAN MEFT YOUR ENVIRONMENTAL GOALS?
【24h】

RISK BASED PLANNING WILL YOUR REGULATORY COMPLIANT PLAN MEFT YOUR ENVIRONMENTAL GOALS?

机译:基于风险的计划将您的监管符合计划兆欧的环境目标吗?

获取原文

摘要

During the 2004 and 2005 Hurricane Season, one of the lesser known results, but potentially more environmentally threatening, were damaged, downed production platforms and the associated production. Downed production platforms have multiple sources of potential releases. Combine multiple downed and damaged production platforms with the need to intervene and secure production, and the risk of an oil release is increased. One question that needs to be answered: What are the related risks to the many different scenarios that could possibly occur during impending, multiple, simultaneous operations? One of the goals BP established was to not have oil impact the shoreline or nearby economically significant marine facilities. Both shoreline and economically sensitive areas are within 12 miles or less of the downed production platforms. To accomplish the no impact goal, a three phased approach was used to create a supplemental response capability. Phase 1: A risk matrix was created to address the multiple potential sources and impacts while evaluating the potential for environmental and economic impact. Phase 2: Utilizing the existing response plan, which met or exceeded regulatory compliance, evaluated the effective ability to respond to the potential risk in the varied prevailing weather conditions and provide the best opportunity for preventing impact to environmental and economic priorities. Phase 3: Developed a fiscally responsible plan to address the short-comings of the existing plan and secured resources based on the evaluation that would provide the best opportunity to meet the BP goals. The paper will provide a discussion of the technical processes used during each phase and present practical means for assessing multiple risks and scenarios. This will include a unique application of a safety risk matrix evaluation. The second area of emphases will expand on the process of using the risk matrix results for resource planning. The principles employed to prepare the response capability are well developed and historically substantiated, but they have been combined in a practical, technical and unique way to planning for environmental response in a real world risk.
机译:在2004年和2005年飓风季节期间,较小的结果之一,但潜在的环境威胁,遭受损坏,污染的生产平台和相关的生产。下行生产平台有多种潜在释放来源。结合多次击落和损坏的生产平台,需要进行干预和安全的生产,并且释放油的风险增加。需要回答的一个问题:在即将发生的多个同步操作期间可能发生的许多不同场景的相关风险是什么?建立的目标之一是没有石油影响海岸线或附近的经济上大型海洋设施。海岸线和经济敏感区域都在禁令平台的12英里或更少。为了完成NO冲击目标,使用三种相位的方法来创造补充响应能力。第1阶段:创建风险矩阵,以解决多个潜在来源和影响,同时评估环境和经济影响的潜力。第2阶段:利用符合或超过法规遵守的现有响应计划,评估了应对各种普遍天气条件的潜在风险的有效能力,并为预防环境和经济优先事项的影响提供了最佳机会。第3阶段:制定了一项财政责任计划,以解决现有计划的短暂转移和基于评估,以提供符合BP目标的最佳机会。本文将提供对每个阶段使用的技术过程的讨论,并提出了评估多种风险和场景的实用手段。这将包括安全风险矩阵评估的独特应用。第二个强调领域将扩展使用资源规划的风险矩阵结果的过程。用于准备响应能力的原则是发达的,历史性地证实了,但它们已以实用,技术和独特的方式组合,以规划在现实世界风险中的环境反应。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号