首页> 外文会议>AIChE Annual Meeting >Challenges and Potential Solutions in GTL FPSO Process Design for Monetization of Offshore Stranded Gas (PPT)
【24h】

Challenges and Potential Solutions in GTL FPSO Process Design for Monetization of Offshore Stranded Gas (PPT)

机译:近海股煤气(PPT)货币化的GTL FPSO工艺设计中的挑战和潜在解决方案

获取原文

摘要

1. GTL FPSO offers an attractive solution to monetize remote, offshore and stranded gas fields. 2. GTL FPSO was completed Feasibility Study & Conceptual Engineering 2.1 20,000 BPD of GTL syncrude products 2.2 Principle dimension (320 m(L) X 60 m(B) X 31.5 m(D)) and storage capacity (1,500,000 BBL) 3. SCR selected for Reforming Technology 3.1 Produce required H2/CO ratio of 2 & Tolerate feed gas with high C02 content 3.2 Elimination of ASU 4. SPR selected for FT Reactor Technology 4.1 Favorable size and weight 4.2 Easier onboard catalyst handling 5. DSME performed various activities in conceptual engineering of GTL FPSO 5.1 Topside: Design basis, Block flow diagram, Process simulation report, Heat & material balance, Topside process simulation, Equipment list, Equipment datasheet, Vendor proposal, Topside layout, and Investment cost 5.2 Hull: General arrangement, Mooring system, Cargo oil system, and Offloading system 6. Preliminary economic analysis indicates economically competitive IRR
机译:1. GTL FPSO提供了一种有吸引力的解决方案,可以通过偏远,海上和搁浅的气田货币化。 2. GTL FPSO已完成可行性研究和概念工程2.1 GTL同步产品的20,000bpd 2.2原理尺寸(320 m(l)x 60 m(b)x 31.5 m(d))和储存容量(1,500,000 bbl)3。scr选择改造技术3.1产生所需的H2 / CO比和具有高CO 2含量的耐受性饲料气体3.2消除ASU 4. SPR选择用于FT反应器技术4.1有利尺寸和重量4.2更容易换山催化剂处理5. DSME在GTL FPSO 5.1顶端概念工程:设计基础,块流程图,流程仿真报告,热和材料平衡,顶侧流程仿真,设备列表,设备数据表,供应商提案,上链布局和投资成本5.2赫尔:一般安排,系泊系统,货物油系统和卸载系统6.初步经济分析表明经济上竞争IRR

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号