UPGRADING OF EXISTING TRANSMISSION LINES AN ATTRACTIVE ALTERNATIVE FOR RIGHT OF WAY CONSERVATION, SPEEDY IMPLEMENTATION OF PROJECTS AND OPTIMUM DEPLOYMENT OF RESOURCES

机译:升级现有传输线是一种有吸引力的替代方案,用于保护权,快速实施项目和最佳部署资源

获取原文

摘要

The Indian Power Sector has an ambitious plan to add about 100,000 MW generating capacity and matching transmission network of various voltage levels of the order of 60,000 kms by 2011-12 i.e. in the next 10 to 12 years. The targets to be achieved within the next 10 years time is almost equivalent to the total development, Indian Power System has witnessed in the last 5 decades. The magnitude of projects to be implemented indicates the need of efficiency and speed required for the implementation agencies to achieve the targets. The Power sector in both generation & transmission functions is highly capital intensive. In the present day scenario where power utilities are experiencing financing crunch and finding it difficult to mobilize additional funds, optimum utilization of investment assumes greater significance. Further, construction of new transmission lines is becoming difficult due to increasing right of way constraints. POWERGRID is aware of the future challenges and constraints and have been looking for new strategies, methodologies and idea and have also taken initiatives for identification / adoption of new technologies for enhancement of transmission capability of existing transmission lines like up rating / upgrading of existing transmission lines which addresses the issues of Flight Of Way conservation, optimized deployment of resources, faster implementation of projects etc.
机译:印度电力部门拥有一个雄心勃勃的计划,可以在2011-12 i.e.在未来10到12年内加入约100,000兆瓦的各种电压水平的传输网络。在接下来的10年内实现的目标几乎相当于总体发展,印度电力系统在过去5年中见证。要实施的项目的大小表明了实施机构实现目标所需的效率和速度。发电和传输功能中的电力扇区是高资本密集型的​​。在当前的情景中,电力公用事业经历融资攻击并发现难以调动额外资金,最佳利用投资利用符合更大的意义。此外,由于增加的方式限制,新传输线的构造变得困难。 PowerGrid意识到未来的挑战和限制,并一直在寻找新的策略,方法和想法,并亦采取了识别/采用新技术的举措,以提高现有传输线的传输能力,如额定电流/升级现有传输线这涉及航班保护,优化资源部署,更快地实施项目等问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号