UPGRADING OF EXISTING TRANSMISSION LINES AN ATTRACTIVE ALTERNATIVE FOR RIGHT OF WAY CONSERVATION, SPEEDY IMPLEMENTATION OF PROJECTS AND OPTIMUM DEPLOYMENT OF RESOURCES

机译:升级现有的输电线路,以保留通行权,专心实施项目并优化资源配置的替代方案

获取原文
获取原文并翻译 | 示例

摘要

The Indian Power Sector has an ambitious plan to add about 100,000 MW generating capacity and matching transmission network of various voltage levels of the order of 60,000 kms by 2011-12 i.e. in the next 10 to 12 years. The targets to be achieved within the next 10 years time is almost equivalent to the total development, Indian Power System has witnessed in the last 5 decades. The magnitude of projects to be implemented indicates the need of efficiency and speed required for the implementation agencies to achieve the targets. The Power sector in both generation & transmission functions is highly capital intensive. In the present day scenario where power utilities are experiencing financing crunch and finding it difficult to mobilize additional funds, optimum utilization of investment assumes greater significance. Further, construction of new transmission lines is becoming difficult due to increasing right of way constraints. POWERGRID is aware of the future challenges and constraints and have been looking for new strategies, methodologies and idea and have also taken initiatives for identification / adoption of new technologies for enhancement of transmission capability of existing transmission lines like up rating / upgrading of existing transmission lines which addresses the issues of Flight Of Way conservation, optimized deployment of resources, faster implementation of projects etc.
机译:印度电力部门制定了雄心勃勃的计划,要在2011-12年前,即在未来10到12年内,增加约100,000兆瓦的发电能力,并匹配各种电压等级的输电网络,功率等级约为60,000 kms。印度电力系统在过去的50年中见证了在未来10年内要实现的目标几乎与总体发展相当。待执行项目的数量表明,执行机构要实现目标需要效率和速度。电力部门在发电和输电方面都需要大量资本。在当今电力公司正处于融资紧缩,难以筹集额外资金的情况下,最佳利用投资具有更大的意义。此外,由于增加的通行权限制,新传输线的建设变得困难。 POWERGRID意识到未来的挑战和制约因素,并一直在寻找新的战略,方法和理念,并已采取措施识别/采用新技术以增强现有传输线的传输能力,例如对现有传输线进行升级/升级解决了通航保护,资源优化配置,项目更快实施等问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号