首页> 外文会议>International symposium on modern tunneling science and technology >Ground Measurement and Prediction with Large Shield Tunnelling Adjacent to Shinkan-sen Track
【24h】

Ground Measurement and Prediction with Large Shield Tunnelling Adjacent to Shinkan-sen Track

机译:Shinkan-sen轨道附近的大型盾构隧道的地面测量和预测

获取原文

摘要

This paper is a case history of the Otsu Diversion Channel Project, i.e. an underground river excavated with shield tunnelling method. The tunnel is crossing under servicing Shinkan-sen track and is required not to disturb any train operation during whole construction period. To achieve the safety of the train operations, precise and frequent ground measurement and prediction with numerical analysis were carried out. In order to make sure a safe construction of the crossing section, pre-measurement sections were set and precisely monitored for ground movements. The comparison between measured results and back analysis is also discussed in the paper.
机译:本文是OTSU转移渠道项目的案例历史,即挖掘隧道法挖掘出地下河流。隧道在Shkinan-sen轨道提供服务下横跨,并且需要在整个施工期间不打扰任何火车操作。为了实现火车操作的安全性,进行了精确和频繁的地面测量和对数值分析的预测。为了确保交叉部分的安全结构,设定预测量部分并精确地监测接地运动。本文还讨论了测量结果与后分析之间的比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号