首页> 外文会议>Conference on Water and Wasterwater Pumping Station Design >Dover Folkestone wastewater treatment scheme, design considerations and optimisation of the pressure surge control for pumping station PS2
【24h】

Dover Folkestone wastewater treatment scheme, design considerations and optimisation of the pressure surge control for pumping station PS2

机译:多佛和福克斯通污水处理方案,设计考虑和泵站PS2压力浪涌控制的优化

获取原文

摘要

The paper presents a brief overview of the design considerations for the Dover and Folkestone Wastewater Treatment Scheme which is being implemented by Southern Water to meet the requirements of the EU Bathing Water and Urban Wastewater Treatment Directives. The design considerations for the pumping station PS2 and the delivery pipeline to the treatment works at Broomfield Bank are discussed together with the pressure surge investigation.
机译:本文介绍了南水正在实施的多佛和福克斯通污水处理计划的设计考虑因素,以满足欧盟沐浴水和城市污水处理指令的要求。泵送站PS2的设计注意事项和对处理工程的交付管道在经过压力激增调查中讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号