The New Henderson Mine Truck Haulage System ― The Last Step to a Totally Trackless Mine

机译:新的亨德森矿山卡车运输系统 - 一个完全无轨道的最后一步

获取原文

摘要

In 1999, the Henderson Mine commissioned the Henderson 2000 project - a new truck haulage level, a new underground crusher and a 24 kilometre conveyor system to replace a 23-year old rail haulage system. Henderson has been able to continuously improve in almost all aspects of its rubber-tired mining. The rail haulage system represented one of the last barriers to continuous improvement to the overall plant performance. Many of the lessons learned in other areas of the mine were utilised to design the truck level. This paper chronicles the benchmarking, equipment selection and design of the level. Areas covered will include haulage trucks, level layout, ore chute design, traffic control, road design and crusher layout.
机译:1999年,亨德森矿委托亨德森2000项目 - 一款新的卡车运输水平,一个新的地下破碎机和24公里的输送机系统,更换了一个23岁的火车牵引系统。亨德森在其橡皮疲劳采矿的几乎所有方面都能够不断改进。铁路运输系统代表了对整个植物性能的持续改进的最后一个障碍之一。在矿井其他地区的许多经验教训被利用来设计卡车水平。本文编年例计算了基准,设备选择和级别的设计。所涵盖的地区将包括运输卡车,水平布局,矿石开槽设计,交通管制,道路设计和破碎机布局。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号