首页> 外文会议>IEEE Annual Symposium on Reliability and Maintainability >Risk-informed reliability-focused decision analysis support for effective facility change management
【24h】

Risk-informed reliability-focused decision analysis support for effective facility change management

机译:风险明智的可靠性决策分析支持有效的设施变革管理

获取原文

摘要

Application of the risk-informed asset management method described herein provides rigorous, systematic, prudent decision-making support for proposed changes to Balance-of-Plant (BOP) equipment (i.e., equipment other than the nuclear steam supply system and conventional standby safety systems) and associated operation and maintenance practices and policies at the South Texas Project Electric Generating Station (STPEGS). The phased approach helps keep the scope of the supporting analyses at a level that supports and promotes reasonable change development efforts and costs. This risk-informed asset management method can easily be adapted to a wide variety of complex systems, processes, and facilities. Consistent, continuous application and improvement of the methods described herein will significantly aid facility decision-makers in optimizing resources to maximize return-on-asset for over the facility life cycle.
机译:本文所述的风险知情资产管理方法的应用提供了对植物平衡(例如,核蒸汽供应系统和传统备用安全系统之外的设备的提出变更,提供了严格的,系统,谨慎的决策支持)南德克萨斯州项目发电站(STPEG)的相关操作和维护实践和政策。相控方法有助于保持支持分析的范围,以支持和促进合理的改变发展努力和成本的水平。这种风险信息的资产管理方法可以很容易地适应各种复杂的系统,工艺和设施。一致的,连续的应用和本文所述方法的改进将显着辅助设施决策者在优化资源方面,以最大限度地为设施生命周期最大限度地提高资产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号