首页> 外文会议>Reliability and Maintainability Symposium, 2002. Proceedings. Annual >Risk-informed reliability-focused decision analysis support for effective facility change management
【24h】

Risk-informed reliability-focused decision analysis support for effective facility change management

机译:以风险为导向的以可靠性为中心的决策分析支持,用于有效的设施变更管理

获取原文
获取外文期刊封面目录资料

摘要

Application of the risk-informed asset management method described herein provides rigorous, systematic, prudent decision-making support for proposed changes to balance-of-plant (BOP) equipment (i.e., equipment other than the nuclear steam supply system and conventional standby safety systems) and associated operation and maintenance practices and policies at the South Texas Project Electric Generating Station (STPEGS). The phased approach helps keep the scope of the supporting analyses at a level that supports and promotes reasonable change development efforts and costs. This risk-informed asset management method can easily be adapted to a wide variety of complex systems, processes, and facilities. Consistent, continuous application and improvement of the methods described herein will significantly aid facility decision-makers in optimizing resources to maximize return-on-asset for over the facility life cycle.
机译:本文所述的风险告知资产管理方法的应用为工厂平衡(BOP)设备(即除核蒸汽供应系统和常规备用安全系统以外的设备)的拟议变更提供了严格,系统,审慎的决策支持)以及南德克萨斯项目发电站(STPEGS)的相关操作和维护惯例与政策。分阶段进行的方法有助于将支持分析的范围保持在一定水平上,以支持和促进合理的变更开发工作和成本。这种具有风险信息的资产管理方法可以轻松地适应各种复杂的系统,流程和设施。本文所述方法的一致,连续应用和改进将极大地帮助设施决策者优化资源,以在整个设施生命周期内最大化资产回报率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号